SAHARA® INLINE TETHERED PIPELINE INSPECTION PLATFORM

The Sahara platform is a tethered inspection tool for assessing pressurized water and wastewater pipelines six inches and larger. The platform detects leaks and gas pockets, collects visual condition, and maps pipelines in a single deployment, without disrupting regular service. With this condition assessment data, pipeline owners can make informed rehabilitation and management decisions on a pipe-by-pipe basis.

Video

SmartBall® Inline Free-Swimming Pipeline Inspection Platform

The SmartBall platform is a free-swimming inspection tool used to detect leaks and gas pockets and map pipeline networks. This platform assesses pressurized water and wastewater pipelines in a single deployment, without disrupting regular service. The SmartBall platform provides utilities with pipeline condition data to make informed rehabilitation and management decisions on a pipe-by-pipe basis.

Video

PureRobotics® Tethered Robotic Pipeline Condition Assessment Platform

The PureRobotics platform is a modular, multi-sensor condition assessment tool for depressurized water and wastewater pipelines. Using accurate electromagnetic and other sensor data paired with live video, this platform provides utility owners with comprehensive pipe wall condition data used to make rehabilitation and management decisions on a pipe-by-pipe basis.

Video

PipeDiver® Inline Free-Swimming Pipeline Condition Assessment Platform

The PipeDiver platform is a free-swimming pipeline condition assessment tool that is easy to deploy and operates while the pipeline remains in service. This tool provides utility owners with pipe wall condition data used to make rehabilitation and management decisions on a pipe-by-pipe basis.

Utilities can save their communities substantial amounts of money, reduce the need for unaffordable rate increases or financing arrangements, and improve the environmental sustainability of their operations – all while maintaining and enhancing system control.

Around the world, critical valves are in poor repair, or even inoperable. When critical valves fail, managers have effectively lost control of their system, increasing vulnerability to water main breaks or any other system hazard. Once valves have failed, utilities have traditionally sought to replace them, often at great cost, both in terms of time and expense.

But what if there were another way? It turns out there is a far more economical, less risky, and more sustainable option: preventative maintenance, repair, and rehabilitation. High performing utilities are turning away from the wasteful practice of replacing valves that can be restored to full function, instead engaging experts in asset renewal to extend the life of those assets at a substantially lower cost.

This white paper will highlight:

  • identifying the true cost of large valve replacements
  • understanding the cost savings of a repair vs replace strategy
  • the benefits of performing routine critical valve assessments
  • what to look for in a valve assessment partner

With advancements in technology and a willingness to develop proactive pipeline integrity programs, utilities can successfully reduce failures, mitigate risk, reduce capital expenditures, and increase confidence in the overall operation of their force mains.

New standards of best practice for force main management involve a variety of methods and technologies to provide data and information with which to make decisions. Utilities can now often perform a detailed condition assessment while the force main remains in service.

There is no “one-size-fits-all” way of assessing force mains. Any approach should be tailored to risk tolerance, material, diameter and past failure history. Savvy utility managers are turning to programs that reduce damage to assets, prioritize investment to minimize community impact of asset failure, and reduce the consequence of failure by enabling system control.

This white paper will highlight:

  • how to develop a risk-based program
  • the most common modes of failure for force mains
  • how to define which of the three approaches to proactively assessing force mains best fits your goals and risk-tolerance
  • how utilities are finding success using these approaches to: prevent failures, reduce capital expenditures, mitigate risk, optimize budget allocation, and increase confidence and level of service.

Case Study

The Town of Flower Mound, Texas (Town), worked closely with Pure Technologies to conduct a leak and gas pocket detection survey of approximately 1.91 miles of potable water mains, which included nearly 1.4 miles of metallic pipelines. The Town is home to 70,000 residents and manages both the water and sewer utilities within Flower Mound.

THE CHALLENGE

In 2001 the Town suffered an uncontrolled leak and lost pressure to a third of their system for a two-day period due to a valve that could not be located. This led to an asset management program, and through this program, the 3.5 mile potable water main was identified in 2015 as a main due for inspection.

Inspecting metallic pipelines has been a challenge for utilities because historically there have been few assessment solutions available. Utilities often used indirect methods of assuming the condition of the pipeline or replaced based on age and consequence of failure, not on the actual condition of the infrastructure. The Town enlisted the help of Pure Technologies to provide a comprehensive condition assessment of key sections of their steel, ductile iron and BWP pipes in order to make balanced and accurate decisions and improve the reliability of service within the system.

How was Pure Technologies able to help the town of Flower Mound address this challenge? Find out and explore the results we achieved together by downloading the full case study below.

VIDEO CASE STUDY

Project Highlights

17 sections with defects identified

1 leak found

1 air pocked identified

1 undocumented outlet located

1 defect validated and replaced

Project Details

Services
PipeDiver® electromagnetic inspection

Sahara® acoustic leak and gas pocket detection & visual inspection

Structural design review

Transient pressure monitoring

Timing
September 2015 – December 2015
Pipe Material
Steel, Ductile Iron, Bar Wrapped
Inspection Length
3.5 miles (5.6 kilometers)
Diameter
20-30 inches
Transmission Type
Water

YOU MAY ALSO BE INTERESTED IN

Whitepaper:
Metallic Pipeline Condition Assessment

Today, new advancements in technologies and data analytics are helping utilities build asset management programs using a risk-based approach to pipeline condition assessment with the lowest financial impact.

There is no one-size-fits-all approach to assessing metallic pipelines. An approach should be tailored within the context of your risk tolerance while taking into consideration the material, diameter, and past failure history. Many different methods and technologies can be combined to provide data and information to make decisions and prioritize pipelines. The approach can range from do-nothing to a full in-line inspection making targeted repairs and be progressive in nature.

This white paper will highlight:

  • how to develop a risk-based program
  • how to define which of the three approaches to assessing metallic pipe best fits your goals and risk-tolerance
  • how other utilities are finding success using these approaches to: extend remaining useful life, optimize capital expenditures, prevent failures, and increase confidence and level of service.

A leak represents not only water loss, but can indicate the potential for pipeline failure.

How proactive utilities are taking the gamble out of finding leaks in order to mitigate failure risk

It takes a lot more than luck and traditional acoustic correlation methods to locate a suspected leak on large critical mains. Not all leaks are obvious, and some leaks can seep for years without visibly surfacing, putting utilities at risk for catastrophic failure.

That is why a proactive leak detection strategy plays such an important role in any asset management program. It allows utilities to obtain the general condition of their mains, since a leak not only represents a real water loss, but can also indicate the potential for pipeline failure.

Recently two water operators — The City of Vancouver, B.C. and The City of Norman, Texas— took measures to mitigate failure risks by implementing a leak detection program for their transmission networks. The utilities deployed various inline leak detection technologies, dependent on such factors as pipe diameter, material, access point availability, and operational constraints.

Acoustic intensity of anomaly and actual leak located

Left: Acoustic intensity of anomaly.   Right: Actual leak located

Inline technologies for leak detection

Inline leak detection technologies use non-destructive methods in which acoustic sensors are inserted into a pressurized pipeline. The “hissing” sound or vibration resulting from a leak in a pipe transmits an acoustic signal collected by the sensor when passing the leak site. The amplitude and frequency of the sound depends on the pipe material and internal pressure, and is easy to distinguish from other pipeline sounds.

Pure Technologies has developed two inline leak detection platforms for large-diameter pipelines of all materials: Sahara® (with a tethered sensor) and SmartBall® (a free-swimming tool).  Both tools are equipped with a sensitive acoustic sensor that can locate very small leaks (as small as 0.1 l/min) with high location accuracy.

SmartBall inside a pipe

The SmartBall tool can be launched while the main remains in operation, limiting disruption to service.

SmartBall leak detection technology

The SmartBall platform is an innovative technique to identify leaks and gas pockets in large-diameter pipelines while the line remains in service, minimizing disruption. The free-swimming ball contains a sophisticated leak detection circuitry and is released untethered into the water flow often through an air valve or hydrant (any 100mm opening). The SmartBall follows the water flow and is tracked by surface mounted sensors as it rolls through the pipe making a continuous recording of the acoustic activity in the pipeline. At a downstream location, the ball rolls into the retrieval device and is extracted from the pipe. The data is then evaluated to report the presence of leaks and gas pockets.

Since the SmartBall is propelled by the water flow, it can be used to survey the subject main for long distances (battery life up to 20 hours) in one deployment. As a result, modifications to the main are significantly reduced.

The tethered Sahara platform provides acoustic data on the presences of leaks and gas pockets and has the ability to map the pipeline alignment.

Tethered Sahara inspection platform

Utilities have long relied on the Sahara leak detection platform for speed, accuracy and real-time results.

The tethered platform identifies leaks and gas pockets by providing acoustic data on the presence of leaks for distances up to 1,800 meters (6,000 feet). The tool also has the ability for mapping the pipeline alignment, and is equipped with CCTV, adding an assessment.

The tool can be inserted into an active pipeline, through almost any tap two (2) inches and greater. As the Sahara tool enters the pipe, the flow velocity of the water inflates a small parachute, which pulls the tool through the pipe, with the probe lighting the way, highlighting any visual defects in the pipeline.

If the Sahara tool encounters any acoustic events – such as a leak – the operator can stop the tool at the exact point of the leak. At the same time, an above ground operator locates the sensor, marking the exact leak location within plus or minus 0.5 meters (18 inches). This enables users to know in real time where leaks are located.

The SmartBall tool was successfully retrieved with the acoustic data intact.

City of Vancouver SmartBall inspection

In March 2016, the City of Vancouver retained the services of Pure Technologies to perform a condition assessment of the Powell-Clark Feeder Main. The pipeline is comprised of concrete cylinder pipe (PCCP/BWP), ranging from 750 to 900m in diameter, installed in 1986-87.

In addition to providing an earlier PipeDiver® electromagnetic inspection to identify broken prestressing wire wraps on the main, Pure Technologies also performed a SmartBall inspection to identify and locate leaks and pockets of trapped gas along the line.

The SmartBall tool was inserted into the pipeline through a flange access and acoustic data was collected and recorded as the tool traversed the pipeline. At a distance of 5.8 kilometers, (470 meters from the end of the inspection run), the tool stopped, which was confirmed by the live tracking software. By analyzing data from the earlier PipeDiver EM inspection, Pure determined that unknown debris likely lodged the SmartBall tool.

The City excavated and modified a tap to allow Pure to access the pipeline with a submersible ROV (equipped with a camera) to retrieve the SmartBall tool and examine the debris, which turned out to be an old tool cart. The cart and SmartBall tool were extracted, and the data considered valid.

Analysis indicated three (3) anomalies characteristic of leaks and zero (0) pockets of trapped gas. Two (2) instances of entrained air were identified as migratory acoustic anomalies, and flagged for future inspection, as they may develop new pockets of trapped air.

When combined with the results from the EM inspection, the condition data will be used as part of the City of Vancouver’s asset management initiative and allow for proactive measures in the management of their infrastructure.

Sahara inspection for City of Norman, Texas 

In December 2016, Pure Technologies performed a leak detection survey on the 30-inch Robinson Street Replacement Water Main (RSRWM) for McKee Utility Contractors (McKee).  The RSRWM is owned and operated by the City of Norman, Oklahoma.

McKee suspected a leak on the pipeline, as the RSRWM was failing to hold pressure during the 150 psi hydrostatic pressure test.  As a result, McKee requested that Pure Technologies inspect 4,248 feet of the RSRWM and pinpoint any leaks in the inspected section.

The Sahara platform was selected for its ability to provide same-day results, and to accurately locate small leaks with sub-meter accuracy. The tethered tool is propelled by a small parachute inflated by the product flow, requiring a flow velocity as little as one foot per second to progress through a water main.

Because the pipeline was not yet in service, the flow was generated with a city connection pushing water into the main, and a 12-inch blow-off spewing it out. The Sahara audio-visual (AV) sensor was deployed to the endpoint using the flow velocity provided by the blow-off.

After the leak was located and marked above ground, McKee quickly excavated around the butterfly valve, tightened the bolts and eliminated the leak on the same day.

Two leaks detected, located and repaired

As a result of the survey, 4,294 feet of the RSRWM was inspected, with two leaks located.

Leak 1 was located 1000 feet from the first insertion. Video from the Sahara tool showed that the leak was located on the mechanical joint securing the inline butterfly valve to the pipeline. The Sahara team located the leak, and marked it above ground and McKee was able to start excavating immediately. After quickly excavating the butterfly valve, McKee was able to tighten the bolts on the BFV, eliminating the leak the same day as the excavation.

A second leak was located, marked above ground, excavated, and repaired the same way as the first. After repairing the two leaks found, the line passed pressure test.

While metallic force mains have been historically difficult to manage, a risk-based approach increases confidence in the condition of the pipeline.

After the Clean Water Act of the 70s required control of wastewater discharge, an increase in force main construction and management across the country was observed. As these assets are now approaching 50 years in age, reducing the risk of failure has become a major regulatory priority. Nothing grabs headline news like the failure of a force main, which can be extremely damaging to the environment and harmful to a utility’s reputation.

Historically, wastewater force mains have been difficult to manage, especially those made with ferrous materials, where the failure method is slow when compared to concrete pressure pipe.

As well, pressurized sewer mains have special operational challenges that don’t apply to gravity sewer mains as they typically cannot be taken out of service for inspection, and due to the presence of solids in the fluid, force mains represent a far more abrasive environment than potable systems such that assessment methods for water mains may not be applicable.

The presence of gas pockets increases the potential of corrosion in metallic pipes.

Gas pockets are of significant concern in force mains.

The primary failure mechanism of ferrous force mains is due to internal corrosion. Gas pockets are of significant concern in force mains, as concentrations of hydrogen sulfide gas within wastewater can be subsequently converted to sulfuric acid by bacteria in the slime layer on the pipe wall. This may cause corrosion and eventual breakdown of the pipe’s wall.

Therefore, a first step in assessing force main condition should be the identification of gas pocket locations within the pipeline.

Pure Technologies has performed an analysis of force mains inspected using acoustic based technologies in order to better characterize the frequency and location of gas pockets. Based on the analysis, it was found that 72% of gas pockets were not at known high points or air release valves, therefore, the most precise way to identify gas pockets within a force main is through the implementation of inline acoustic inspection technologies.

The collection of gas pocket locations alone will not indicate the condition of the pipeline, but instead identifies locations where an increase in corrosion potential is observed. To ascertain the true condition of a pressure pipe, higher resolution electromagnetic technologies are required. These technologies measure pipe wall thickness in ferrous materials and broken wire or bar wraps in concrete pressure pipe.

Once the condition data is collected, advanced analytics can be applied to estimate the pipeline’s remaining useful life.

“Previous analyses involved straight-line assumptions – comparing the pipe wall thickness at installation against what it is today. However this doesn’t give an accurate picture of how pipes degrade…by using statistical modeling we can develop a more predictable degradation rate based off of over 14,000 miles of inspection data Pure has collected over the past 30+ years.”

Jennifer Steffens, Market Sector Leader, Water and Wastewater, Pure Technologies

Desktop studies are not always reliable.

While often the first thought is to replace the aging wastewater assets based on factors such as age and failure history, this option makes neither logical nor financial sense. With so many miles of buried pipelines and such limited capital budgets, utilities don’t have hundreds of millions to spend on replacing pipelines which still have remaining useful life.

At Pure Technologies, we believe there is a better way. A more feasible approach to ensuring the safe operation of force mains is to undertake a risk-based approach to manage their operation. A risk-based approach will provide decision intelligence on which assets require rehabilitation or replacement to extend their useful life. Or which assets can be left alone.

Our approach is to help utilities evaluate the current state of their buried infrastructure and provide them with high confidence condition and operating data.   We then couple this with our years of extensive experience and project history (more than 12,000 kilometers of pressure pipe assessment) to provide utilities with actionable information, which allows them to make informed decisions as to the management of these critical assets.

The value of a risk-based approach to manage force mains.

Utilities that embrace a risk-based approach to manage their force main inventory have found that on average they can safely manage their force mains for roughly 5 to 15 percent of the replacement cost. This pragmatic approach focuses on providing real condition data through assessment, which can be used to selectively renew isolated areas of damaged pipe in lieu of capital replacement.

At Pure, we recommend a risk-based approach to manage wastewater force mains by focusing on four main areas:

  • Preliminary Risk Analysis
  • Internal Corrosion Potential Surveys using Inline Acoustics
  • Pipe Wall Assessment using Advanced Technologies
  • Condition Data Analysis and Advanced Risk Assessment

Some of the common reasons leading to failure on ferrous pipes.

Preliminary Risk Analysis

Preliminary analysis includes collecting the right data to develop a prioritized plan for assessment, including the selection of appropriate technologies. To help make preliminary decisions, Pure collects all available information to understand the history of the pipeline and the likely failure modes.

The data analysis will provide an understanding of the construction and context of the pipeline. Data of interest typically includes pipe characteristics, installation factors, environmental and performance-related data, operational data, and failure data.

Acoutic-based SmartBall® tool locates leaks and gas pockets

Acoustic-based SmartBall® tool locates leaks and gas pockets.

Sahara is an inline tethered tool used to locate leaks and gas pockets in pressurized lines.

Internal Corrosion Potential Survey.

An internal corrosion potential survey uses inline tools to locate gas pockets that can increase the potential for corrosion and eventual breakdown of the pipe wall. Pure Technologies typically deploys its acoustic-based SmartBall® leak and gas detection tool, as well as its tethered Sahara® leak and gas pocket detection platform to locate gas pockets in pressurized lines of all materials.

Pipe Wall Assessment.

While the presence of gas pockets may indicate areas of potential concern, it will not give a quantifiable answer as to the structural life of the pipe.

Pipe wall assessment is completed using a variety of technology solutions to identify defects and deterioration of the pipe wall in a variety of pipe materials. For pipe wall assessment of metallic force mains, common internal electromagnetic technologies include the PipeWalker® and PureRobotics® platforms, as well as the free-swimming 24-detector PipeDiver® assessment tool, developed to identify electromagnetic anomalies indicating pipe wall loss.

PipeDiver® assessment tool identifies electromagnetic anomalies indicating pipe wall loss.

Condition Assessment Analysis.

Condition data analysis and risk assessment evaluates how to safely renew or extend the life of force mains. The risk evaluation considers not only the probability of failure (condition) of the force main based on inspection data, but also the consequence of failure in order to make sound engineering decisions.

Understanding the risk of the pipeline is an important step in selecting and justifying the appropriate condition assessment methods. As the risk of the asset increases, the value of using high-resolution comprehensive assessment techniques increases. Higher resolution data results in more confident decision making, and would justify and prioritize the application of assessment techniques.

Diagnostic analytics helps utilities move risk assessment forward.

In the past, inspections were done, the data analysed, and the results passed on to the utility. Pure Technologies now offers a more holistic program of diagnostic analytics. This includes analysis of what caused the corrosion problem within the pipe wall, what the impact the corrosion has on the life of the pipeline, and a prescriptive analysis of how it needs to be repaired or rehabilitated.

The next step gathering momentum? Predictive analysis to elongate service life.

 

For this Vancouver Island community, tight deadlines, plug valves, and a rising tide were among the challenges faced during this condition assessment project.

Sometimes the catalyst for a pipeline inspection can come from an unexpected source. In this instance, the story began when it was noticed that a sewer pipe was exposed from erosion during low tide along the beach. That observation set the wheels in motion for an eventual inspection of a critical force main that services approximately 41,000 residents in both the Town of Comox and the City of Courtenay on the eastern coast of Vancouver Island.

The pipeline was installed in the early 1980s, and consists of an 8.75 km large-diameter force main that connects the City of Courtenay, Town of Comox and K’ómoks First Nation Community to the Comox Valley Water Pollution Control Centre (CVWPCC). This includes a five-kilometer portion buried in an “intertidal” foreshore section (area between high and low tide).

Over time, a section of beach eroded and exposed the line to coastal wave action (high tide hides the pipe). The Comox Valley Regional District (CVRD) took steps to restore the beach section where pipeline had been exposed, and began developing plans to relocate the exposed force main off the foreshore.

Island community concerned about pipeline risk of failure.

Sensitive location and potential environmental consequences strike nerve with community.

A new concept was developed that would utilize a portion of the existing force main within the foreshore but remove from service the exposed force main. Due to its sensitive location and the environmental consequences of a potential failure, the CVRD elected to complete a highly specialized pipe condition assessment on the entire length of the line to better understand the remaining service life and condition of the force main. As a result, the project timeline was tight, as CVRD needed imminent results to proceed with corrective action immediately should it be required.

The assessment challenges began from the get-go.

The inspected portion of the pipeline was built of two different pipe materials (PCCP and BWP) and three different pipe diameters (450-, 750- and 820-mm). As well, the critical line could not be taken out of service. The CVRD consultant, Associated Engineering, assisted in developing the request for proposal (RFP) process used to select Pure Technologies (Pure) to conduct the condition assessment, which included an electromagnetic inspection, structural curves, leak and gas pocket detection, and transient pressure monitoring.

Pure proposed the acoustic-based SmartBall® tool for the leak and gas pocket detection, and its free-swimming PipeDiver® inspection platform for the electromagnetic inspection of the line.

“This project had a lot of challenges, especially since the asset was so critical to the region. However Pure was able to help us understand the true condition of the line without requiring a shutdown of the critical force main, and has given us defensible information to make informed decisions in the future.”

Kris La Rose, Senior Manager Water/ Wastewater Services, Comox Valley Regional District

Pipeline alignment follows along the Vancouver Island coast.

Transient pressure monitoring used to understand surge pressures within the line.

First, transient pressure monitors were installed at the Courtney Pump Station (CPS). For more than 4 weeks, the recorded pressure data was used to understand the operational and surge pressures within the force main and their impact on the structural integrity of the pipeline.

SmartBall® technology detects and locates acoustic signature related to leaks and gas pockets.

While transient pressure data was collecting, Pure deployed its proprietary SmartBall technology, a multi-sensor tool used to detect and locate the acoustic signature related to leaks and gas pockets in pressurized pipelines.

The tool has the ability to inspect long distances in a single run, and while the SmartBall is deployed, the pipeline remains in service, limiting disruption to customers.

PipeDiver tool collects electromagnetic data regarding the pipe wall.

PipeDiver® electromagnetic technology designed to assess PCCP, BWP and metallic pipes.

In addition to utilizing the SmartBall tool, Pure chose to deploy the PipeDiver platform, a free-swimming condition assessment tool that collects electromagnetic data regarding the pipe wall, and operates while the pipeline remains in service, an important factor for the force main inspection. The tool travels with the product flow and utilizes flexible petals to navigate plug valves, tees and bends in the pipeline.

Crews had to retrieve the PipeDiver tool within a short 20-minute time window.

Tight time-frame for tool insertion and retrieval of sensor data.

Due to the criticality of the line, and a small capacity wet well at the CPS, the inspection teams had a very short time window (20 minutes) to insert the inspection tools. The small capacity wet well also meant that boosting flows was limited – if pumped too hard, the wet well would draw down and empty, and if pumped too slow, the PipeDiver tool could get lodged at the inline plug valves. (Low flow rate is not a significant problem for the SmartBall tool.) The solution was to first use the SmartBall inspection tool to test the flows in order to optimize the inspection approach for the PipeDiver run.

While the low flow rate slowed the SmartBall inspection, a forecast of rain moved up the PipeDiver run a day ahead in order to take advantage of extra flows that could be provided by the wet weather. The tool also had to navigate a series of 90-degree bends and a plug valve with a small port width in the pump station pipe.

Tracking the tools along the beach was fraught with potential for problems. Inspection crews needed to monitor the tidal forecasts in order to access the tracking sensors during the tide ebb, which meant a short window to retrieve the sensor data.

In spite of the challenges and risk, the dynamic four-day inspection proved successful, and went off without a hitch. The Pure Technologies crew and CVRD operators worked very well together, and their collaborative efforts ensured that this important project was successfully completed.

Damp weather didn’t dampen the inspection ingenuity of the team.

Data analysis indicated no electromagnetic distress on inspected pipes.

Based on the inspection data, Pure analysts identified zero (0) leaks, one (1) acoustic anomaly associated with trapped gas, five (5) acoustic anomalies characteristic of transient gas and two (2) acoustic anomalies associated with entrained gas. In particular, gas pockets are of significant concern in force mains, as concentrations of hydrogen sulfide gas within wastewater may be subsequently converted to sulfuric acid by bacteria in the slime layer on the pipe wall.  This may cause corrosion and eventual breakdown of the pipe’s exposed surface.

The results also showed no indication of electromagnetic distress on the inspected pipes, which was good news, in spite of the corrosive salt water environment.

Overall, the CVRD was pleased with the inspection results, as they were able to understand the condition of the pipeline and make an informed decision for capital improvements. The project demonstrates how the region uses actionable data to effectively manage their finances and risk, while continuing to provide the community with a safe and reliable delivery of wastewater.

 

Case Study

The Trinity River Authority of Texas (TRA) owns and operates 8.5 miles of 30-inch BWP and PCCP that supplies raw water from Lake Arlington to the Tarrant County Water Supply Project Water Treatment Plant in Euless, Texas.

The 30-inch pipeline, in conjunction with a parallel 54-inch pipeline, conveys raw water to the Authority’s 87 mgd WTP. Treated water produced at the WTP is supplied to five cities in the mid-cities region between Dallas and Fort Worth including Bedford, Colleyville, Euless, Grapevine and North Richland Hills.

Project Details

Services
SmartBall® Leak Detection
PipeDiver® Condition Assessment
Transient Pressure Monitoring
C303 Bar-Wrapped Pipe structural performance curves
Timing
November 2012 – July 2013
Pipe Material
Bar-Wrapped Pipe and PCCP
Inspection Length
8.5 miles (14 km)
Diameter
30-inch (750mm)
Transmission Type
Raw Water

Project Highlights

SmartBall survey identified 4 leaks and 3 air pockets

Only 1% of BWP sections identified as distressed

TRA verified and repaired 3 high-risk BWP sections

Cost was roughly 4% of the replacement estimate of $25 million

Challenge

TRA had originally planned to replace this pipe­line, but chose to assess and selectively rehabili­tate the pipeline by finding solutions that could identify the most distressed areas. The pipeline spans about 8.5 miles and is made up primari­ly of BWP, although there are some sections of PCCP. It was constructed in 1973.

Solution

In November 2012, TRA began a condition assessment program that included transient pressure monitoring, acoustic leak and gas pocket detection, internal electromagnetic inspection, and structural condition assessment including finite element analysis.

For the leak and air pocket assessment, TRA used SmartBall® technology. The SmartBall inspection tool is a non-destructive, free-swim­ming technology that measures the acoustic activity associated with leaks and gas pockets in pressurized pipelines. When acoustic anomalies are present, the data is analyzed to determine if it is a leak, gas pocket, or just an external sound.

Regular leak detection inspections can help util­ities identify leaks that may not be visible at the surface. By repairing leaks, utilities can reduce their non-revenue water and prevent pipeline failures, as leaks are often a preliminary indi­cation of pipeline deterioration. Location and elimination of air pockets is also beneficial as it reduces pressure on pumps that are attempting to pump water past a gas pocket.

For the structural inspection, TRA used PipeDiver®, a free swimming electromagnetic tool that identifies wire breaks in PCCP and bar breaks and broad areas of cylinder corrosion in BWP using electromagnetic technology. The tool oper­ates while the pipeline remains in service.

Although BWP looks similar to Prestressed Con­crete Cylinder Pipe (PCCP) in cross section, their design and materials are significantly different. PCCP is a concrete pipe that remains under compression because of the prestressing wires, with the thin-gauge steel cylinder acting as a water membrane. With BWP, the cylinder plays a much larger role in the structural integrity of the pipe. BWP is essentially designed as a steel pipe with mild steel used to manufacture the steel cylinder and steel bars.

As a result, the bar in BWP and wire in PCCP respond differently to environmental conditions that facilitate corrosion. The high strength steel wire in PCCP is smaller in diameter and wrapped under higher tension, therefore corrosion makes it quite vulnerable to breakage. The mild steel bars in BWP are thicker in diameter and wrapped under less tension, therefore corrosion takes sig­nificantly longer to lead to breakage.

The engineering services portion of the project was completed to identify optimal operating conditions for the pipeline and determine the structural performance of the pipe materials. This included creating performance curves for TRA’s BWP, as well transient pressure monitor­ing.

The BWP structural performance curves allowed TRA to determine which pipe sections to exca­vate and verify. By determining the bar break yield limit for the specific pipe material, TRA was able to identify which pipe sections should be immediately addressed and which could remain in safe operation.

Results

The SmartBall® survey identified four leaks and three gas pockets. Although the four identified leaks were small (less than 2 gallons per minute), one was located in the front yard of a brand new church building and could have caused signif­icant water damage had it not been repaired immediately by TRA. Water from this leak was visible at the surface 325 feet away from the actual leak location.

The structural inspection using PipeDiver® iden­tified four PCCP pipes with electromagnetic anomalies resembling wire breaks. The inspec­tion of the BWP identified 14 pipes with bar break damage and 72 pipes with electromagnet­ic anomalies resembling cylinder defects out of 1,284 inspected pipes.

TRA has verified and repaired three sections of BWP that were beyond the yield limit deter­mined by the structural performance curves. Upon verification, TRA and Pure determined that distress areas identified in the inspection were accurate and the excavated pipe sections had bar breaks and corrosion.

By repairing specific pipe sections with dete­rioration, TRA was able to avoid replacing the entire 8.5 mile pipeline at a high capital cost. Completing condition assessment has also allowed TRA renew its pipeline infrastructure and continue providing reliable service to cus­tomers in the region.

Case Study

The City of Calgary provides water and wastewater services for more than 1 million people in the Greater Calgary area. For many municipalities, accurate and regular condition assessment of large-diameter pressure pipelines has become more important in recent years as these assets continue to age and risk of failure increases.

In Calgary, three critical feedermains (14th Street/North Hillhurst, John Laurie and Top Hill) are each constructed of different materials: lined cylinder pipe (LCP), prestressed concrete cylinder pipe (PCCP) and bar wrapped pipe (BWP). The pipes range from 750mm (30-inch) to 900mm (35- inch) in diameter.

Project Details

Services
PureRobotics® electromagnetic condition assessment

PureRobotics® HD-CCTV inspection

Risk Prioritization

Timing
2015
Pipe Material
PCCP, LCP, BWP
Inspection Length
4.74 km (2.9 miles)
Diameter
750mm-900mm (29-35 inch)
Transmission Type
Water

Project Highlights

Condition assessment on 2.92 miles (4.7 kms) of feedermain pipes

Data identified 8 pipes with electromagnetic anomalies consistent with broken pressing wire wraps

HD-CTTV identified 3 pipes with damaged internal mortar and exposed cylinder

Challenge
In an annual condition assessment program, The City inspects its PCCP, BWP and LCP for deterioration. By identifying isolated pipe sections with deterioration, the City is able to make selective repairs in favor of full-scale replacement, which comes at a high cost and may replace sections with significant remaining useful life.

In data collected from more than 14,000 miles of pressure pipe condition assessment, Pure Technologies has found that only a small percentage of pipes (less than 5 percent) are in need of repair and therefore have years of service left. Condition assessment data also suggests that pipe distress is localized, and significant ROI can be achieved by locating and addressing isolated problems through structural inspection.

Solution
To inspect the three feedermains, the City deployed PureRobotics®, a tethered robotic system that delivers live video, and is equipped with electromagnetic technology that can be configured to inspect a variety of pipelines and materials with different operational conditions.

In BWP, the technology identifies and locates broken bars and areas of corrosion on the steel cylinder, which are the main indication this type of pipe will eventually fail. Although BWP looks similar to PCCP in cross section, the design and materials are significantly different.

PCCP is a concrete pipe that remains under compression because of the prestressing wires, with the thin-gauge steel cylinder acting as a water membrane. With BWP, the cylinder plays a much larger role in the structural integrity of the pipe. BWP is essentially designed as a steel pipe with mild steel used to manufacture the steel cylinder and steel bars. PCCP utilizes mild steel for the cylinder, but high strength steel is utilized for the wire, which is wrapped under high tension. As a result, the bar in BWP and wire in PCCP respond differently to environmental conditions that facilitate corrosion.

The high strength steel wire in PCCP is smaller in diameter and wrapped under higher tension, therefore corrosion makes it quite vulnerable to breakage. The mild steel bars in BWP are thicker in diameter and wrapped under less tension, therefore corrosion takes significantly longer to lead to breakage. The type of failure is also much different; PCCP tends to fail suddenly with a large dispersion of energy. This type of failure is less likely in BWP where failures are similar to steel pipe with long periods of leakage occurring prior to rupture. Because of the differences in make-up, BWP and PCCP are inspected using unique methods to determine their structural condition.

Results
Of the 694 pipes cumulatively inspected over the 4.74 kilometers, eight (8) pipes were identified with electromagnetic anomalies consistent with broken prestressing wraps. Additionally, two (2) pipes were found with an anomalous signal not characteristic of broken bar wraps that can be attributed to a change in the pipe cylinder.

Evaluation of the John Laurie Boulevard Feedermain concluded that one (1) pipe was identified to have an anomalous signal likely caused by a non-uniform cylinder. Images obtained from the robot indicated this pipe has damaged internal mortar and exposed cylinder. Additionally, two (2) pipes on this feedermain were identified to have damaged internal mortar and exposed cylinder, but did not contain anomalous signals.

The City of Calgary was pleased with the results, and through condition assessment, has been able to identify and address individual distressed pipe sections on otherwise serviceable feedermains. This has allowed the City to avoid potential ruptures, while increasing service reliability and useful life of the feedermains.

For utilities with large-diameter networks, waiting for failures to occur before repairing or replacing highly critical mains is not an option.

Massive pressured water lleak on a street

With a large amount of buried water infrastructure reaching the end of its service life, operators have every incentive to take a proactive approach to asset management.

Nowhere is this more critical than in busy urban centres. The fallout from an unexpected failure can have major societal costs, and greatly diminish public confidence in the utility.

Asset management begins with condition assessment

Successful asset management begins with condition assessment, the point at which problems and challenges are understood and shaped into definitive plans from both an operational and financial perspective.

To proactively address their pipeline conditions, operators today have access to variety of tools, technologies and engineering analysis that allow for a comprehensive condition assessment of large-diameter pressure pipes, for both water and wastewater systems.

“Unfortunately there is no ‘silver bullet’ with regard to condition assessment technologies,” said Mike Wrigglesworth, Senior Vice President of Pure Technologies. “Each pipeline is unique, and no single technology is the fix for all situations. A combination of factors, from pipe material to soil conditions, operational challenges, age, installation and third party factors will all play a role in the likelihood of failure. Combined with the consequence of failure, a risk-based approach can then be used to select the best condition assessment tool or technologies.”

Matching assessment technology with the pipeline conditions and project goals

While operators can now deploy a number of data-based tools and techniques to assess pipeline conditions, each technology also comes with varying degrees of limitation. For instance, while magnetic flux leakage (MFL) tools provide the highest resolution data for steel pipe, MFL is of limited value for concrete pipe.

Medium resolution techniques such as electromagnetics can identify localized areas of wall loss on metallic pipes such as ductile iron and steel, but not on cast iron pipe as cylinder thickness is often too thick and material properties vary considerably, negatively affecting results. In both cases, it is often prudent to deploy leak detection technologies, as studies show joint defects lead to leaks, and leaks are precursors to failure.

“Often the best solution is to use different but complementary technologies to collect robust condition data that is then evaluated using engineering analysis against a comprehensive risk of failure versus a consequence of failure analysis.”

Sahara® Leak and Gas Pocket Detection

Pure’s proprietary Sahara® inspection platform is a tethered, multi-sensor tool that can identify acoustic-based leaks, gas pockets and visual anomalies in real time, with no disruption to service.

The Sahara tool features a small parachute that uses the product flow to draw the sensor through the pipeline while being controlled from the surface.

SmartBall® Leak and Gas Pocket Detection

SmartBall® is a multi-sensor tool used to identify a variety of conditions in pressurized pipelines. The tool is easy to deploy through existing pipeline features, and travels untethered with the product flow, collecting information.

The tool’s highly sensitive acoustic sensor can locate small leaks and gas pockets, with typical location accuracy within 6 feet (1.8 m).

PipeDiver® Condition Assessment

PipeDiver® is a free-swimming condition assessment tool that operates while the pipeline remains in service.

Originally designed for use in PCCP, the tool has electromagnetic sensors to identify and locate broken prestressing wire wraps. For metallic pipelines, the optimized PipeDiver has the ability to pinpoint localized areas of wall loss.

The tool is also able to deliver video images from inside the pipe.

PipeWalker™ Condition Assessment

The PipeWalker tool provides a viable option for pipeline condition assessment in situations where the pipe is dewatered or where the option to dewater is available.

The tool is equipped with electromagnetic sensors for detecting wire wrap breaks on PCCP pipes and for detecting corrosion on metallic pipes.

PureRobotics® Pipeline Inspection

PureRobotics® is a depth-rated robotic pipeline inspection system that can be configured to inspect pipe applications 24-inches and larger.

Tethered by a high-strength fiber optic cable, the crawler is capable of performing multi-sensor inspections in dewatered pipes or while submerged in depressurized pipes.

The crawler features HD digital CCTV, and can be equipped with electromagnetic sensors, Inertial Mapping, 3-D LIDAR, LASER, SONAR and other tools upon request.

Matching the level of resolution to the risk of the line

While there are a variety of approaches available for assessing a pipeline’s condition, much of an operator’s effort must go into matching the level of resolution of the approach to the overall risk of the line.

The idea is to put the highest resolution technologies on the most critical lines. In the end, the goal of deploying a particular technology (or complementary technologies) is to identify and locate the areas that need rehabilitation or repair as opposed to wholesale replacement of those lines.

Armed with the right information, operators can determine remaining useful life, and confidently move forward to prioritize and target capital spending, while avoiding failures.

Case Study

The City of Montreal supplies drinking water and wastewater services to a population of nearly 1.9 million people. Starting in 2007, Pure Technologies (Pure) began working with the City’s potable water transmission division on a pipeline assessment program that included electromagnetic (PureEM) inspection and acoustic monitoring.

In 2015, as part of a pre-emptive program to reduce loss of non-revenue water and understand the condition of their pipes, the City partnered with Pure to conduct an ongoing, three-year leak detection survey on a series of critical pipes within its potable water network located mostly in the downtown core.

Project Details

Services
Sahara® leak detection

CCTV visual inspection

Timing
2015-Ongoing
Pipe Material
BWP, Steel, Cast Iron, PCCP
Inspection Length
28.9 km (18.5 m)
Diameter
500mm – 1200mm (20-inch – 48-inch)
Transmission Type
Water

Project Highlights

20.8 miles (33.5 kms) inspected to date

46 insertions completed

24 leaks identified

9 leaks identified as feature leaks

Challenge
The City recognized the value of detecting leaks, however small, to prevent these from developing into greater problems. While leaks occur most frequently on small-diameter distributions mains, leaks and ruptures on trunk mains are a much bigger concern for utility operators due to the relatively higher consequence of failure.

In addition to physical losses of water caused by a series of small leaks, the escaping water can eventually erode the surrounding soil making the area more prone to washouts or sinkholes, a major headache especially in densely populated areas. Leaking water can eventually find its way to the surface, or into sewers, overburdening the system. Unplanned excavations to repair unforeseen leaks can also erode consumer confidence in a public utility.

Solution
For its multi-year leak detection program, the City requested Pure to deploy its highly reliable and precise Sahara® acoustic video inspection on 46 kilometers of pipelines chiefly in the downtown core. The pipeline sections consist of PCCP, BWP, cast iron and steel.

The Sahara platform comes with a variety of sensor tools to perform the inspection. This includes an acoustic sensor to perform leak and gas pocket detection, and high-resolution video camera to assess internal pipe conditions.

Because the Sahara tool is drawn by product flow via a small drag chute, and is tethered to a data acquisition unit on the surface, it gives the operator close control to confirm suspected leaks, gas pockets and other visual anomalies. The tool can visually confirm pipe irregularities, continuously recording, allowing for both real-time and post-processing analysis.

For the Montreal project, the purpose of the Sahara inspection was to assess the condition of the pipeline by identifying and locating leaks, pockets of trapped gas and to identify larger visual anomalies utilizing Closed Circuit Television (CCTV) footage collected during the inspection. The data would help shape the rehabilitation urgency and timing.

 

Results
To date, Sahara has had 46 insertions and a total of 33.5 kilometers (20.8 m) have been assessed. Analysis of the data identified 24 leaks and zero (0) gas pockets in the pipeline sections inspected. The Sahara sensor was tracked above ground using the Sahara Locator® device to track the Sahara tool and locate any potential leaks or anomalies found.

 The assessment is proving its worth from a verification viewpoint, and the leaks have been either repaired or addressed for prioritization. The current program is scheduled for completion by 2017.

With its pre-emptive leak detection program, the City is Montreal is a great example of a smart water manager taking proactive efforts at keeping its network in healthy shape.

Speak to One of Our Experts





Since 2007, utilities all over the world have been using the SmartBall® pipeline inspection platform to save millions of dollars in water loss and to fix leaks before they turn into larger problems.


Developed by Pure Technologies (Pure), the tool is trusted by utilities for two main reasons. One is for condition assessment purposes, and the other is for reducing non-revenue water. From a condition assessment perspective, SmartBall® is a proactive tool that can be used as part of a larger holistic approach to help identify problem areas that require repairs before they turn into bigger issues, and also to help utilities prioritize capital spending.

SmartBall inside a pipe.

Detect and locate acoustic sounds related to leaks and gas pockets

The primary purpose of the SmartBall tool is to detect and locate the acoustic sounds related to leaks and gas pockets.

“Unlike traditional correlators, the SmartBall sensors travel inline along the pipe, inspecting every inch of the water main to detect potential problems such as leaks and gas pockets. Based on thousands of miles of experience, the SmartBall tool has found three to four times more leaks than trunk main correlators, which are traditionally used in smaller diameter pipes, and are less effective for transmission mains and larger diameter pipes.”

Cam White

Business Line Manager, SmartBall

Deployed for long runs in one inspection for water and wastewater pipelines

What makes the SmartBall tool so remarkable is its ability to get into and out of pipelines very easily, and to be deployed for long runs in one inspection for both water and wastewater pipelines. The tool requires only two access points – one for insertion and one for extraction.

For insertion, the foam-shelled SmartBall tool is placed into a claw, compressed, and then lowered into the line through a 4-inch (100mm) or larger tap, all while the line is pressurized. Throughout the survey, Pure’s inspection team constantly monitors the SmartBall’s position as it traverses the pipeline collecting data.

  • An acoustic sensor listens for leaks and gas pockets.
  • An accelerometer and gyroscope measure the SmartBall’s movement, which can later be used for pipeline mapping.
  • A magnetometer measures the magnetic field coming off the pipe wall, data that can be used to find joints and other pipeline features.
SmartBall extraction process

Multiple insertion and extraction options available

There are many alternative options available to get the SmartBall in and out of a pipeline. Having multiple options reduces the money and effort required by utilities to support the inspection.

Once the inspection is complete, the data is extracted from the ball and sent to Pure’s data analysts where they will identify leaks and gas pockets.

As utility owners know, it can be expensive to excavate, and what SmartBall tool does is provide information that’s accurate, so clients can dig up the pipeline and find the leak the first time.

Rideau Canal, Ottawa

For the City of Ottawa, the SmartBall tool is used to locate “leak-where-predicted”

The “leak-where-predicted” scenario recently happened with the City of Ottawa when Pure deployed its SmartBall inspection platform to locate leaks and pockets of trapped gas along a critical transmission main, as part of a long-term condition assessment program for the municipality.

The Baseline Road Water Transmission Main is a high priority 1220mm (48-inch) diameter pipeline comprised of lined cylinder pipe (LCP).

For the City of Ottawa project, five (5) surface-mounted acoustic sensors were placed along the pipeline to track the SmartBall tool during the inspection. The SmartBall device was inserted into the pipeline through a 100mm drain near a hospital. Acoustic and sensor data was collected and recorded as the SmartBall tool traversed the pipeline for more than three kilometers.

From the survey results, Pure detected one (1) acoustic anomaly characteristic of a leak and zero (0) anomalies consistent with pockets of trapped gas.

The “leak-where-predicted” scenario recently happened with the City of Ottawa when Pure deployed its SmartBall inspection platform to locate leaks and pockets of trapped gas along a critical transmission main, as part of a long-term condition assessment program for the municipality.

The Baseline Road Water Transmission Main is a high priority 1220mm (48-inch) diameter pipeline comprised of lined cylinder pipe (LCP).

For the City of Ottawa project, five (5) surface-mounted acoustic sensors were placed along the pipeline to track the SmartBall tool during the inspection. The SmartBall device was inserted into the pipeline through a 100mm drain near a hospital. Acoustic and sensor data was collected and recorded as the SmartBall tool traversed the pipeline for more than three kilometers.

From the survey results, Pure detected one (1) acoustic anomaly characteristic of a leak and zero (0) anomalies consistent with pockets of trapped gas.

SmartBall inside a pipe and working zone map

Ground microphones fail, SmartBall tool succeeds

Although Pure was confident in the SmartBall leak detection data, sometimes it’s worth a try to verify an anomaly with a complimentary technology. In this instance, ground microphones, regarded as a conventional a leak detection tool, were deployed to try and detect leak sounds. Although the suspect area was marked, neither Pure nor the client could pick up leak-related sounds from the ground microphone.

Even though the leak was not picked up by the ground microphone, Pure was confident that the acoustic signature from the SmartBall was caused by a leak, based on more than 15 years of experience identifying leaks. That confidence and experience proved right, and when the suspected area was excavated, the leak was located within a meter of where the data analyst calculated the leak to be.

The results gave the City of Ottawa actionable data regarding the condition of their pipeline, and the City was able to fix the leak reducing non-revenue water loss and any potentially costly damage caused by the leak. It’s a great example of a proactive utility taking efforts to improve the reliability of its services.

What keeps a water utility manager up at night? Getting a phone call from a distraught resident about an unplanned (and unwanted!) ornamental pond developing in the cul-de-sac.

On an already soggy, wet day in early November 2016, water began filling a cul-de-sac in an affluent neighbourhood in the City of Southlake, Texas. To contain surface flooding, Southlake water authorities took immediate remedial action by sequentially shutting down each water line in the area in an attempt to isolate the leak.

“As for using the Sahara tool to find the leak, upon saw cutting the street and excavating, Pure Technologies hit the bullseye yet again for Southlake.” Kyle Flanagan

Water Department Supervisor, City of Southlake

In addition, the City used external listening devices to try and locate the leak – the external listening devices indicated that some kind of leak was present, but the City was unable to pinpoint the location. In the end, the City had to shut down the 42-inch Caylor bar-wrapped potable water main, a low-pressure gravity main passing through the area. This was done to confirm that the 42-inch Caylor Main was leaking.

Sure enough, once the 42-inch Caylor Main was shut down, the water stopped surfacing. When the City reopened the main, the water did not resume surfacing. Despite the inconclusive evidence, the City remained convinced that the 42-inch main was the leak source.

Workers with horses in a field

Soggy ground, horse pasture and and muddy conditions hamper inspection

With uncertainty remaining, the City of Southlake called in Pure Technologies to assist in identifying and locating the leak. Unfortunately, the bad luck continued, as heavy rains and muddy conditions hampered Pure and its mobilization truck from access to the pipeline right-of-way. Even crews from Southlake got stuck when they tried drive the pipeline right-of-way.

One possible additional access point was available through a private owner’s horse pasture, but low-hanging power lines created a safety hazard that would prevent crews from accessing the site by that route.

Disappointed, the crews demobilized to wait for better weather or a better access point.

Sahara device

Sahara® platform selected for speed, accuracy and on-the-spot results

The next day Southlake identified another access point 1,000 feet further upstream, and prepared it for the Sahara inspection.

The Sahara leak detection platform was selected for its ability to provide same day results, and to accurately locate small leaks with sub-meter accuracy. The tethered tool is propelled by a small parachute inflated by the product flow, requiring a flow velocity as little as one foot per second to progress through a water main.

Because the Sahara inline tool is tethered, an operator has complete control, and can closely examine events of interest such as leaks, gas pockets and visual anomalies in real time.

The tool can detect up to four times as many leaks as correlators because the acoustic sensor is brought right to the leak. The Sahara platform also features inline video that allows operators to observe internal pipe conditions, and many times identify the type of leak – indicating if the leak is on a joint, in the pipe barrel, at a feature, and other details helpful for planning a repair before excavating.

Pipe inner surface

Second attempt to find the leak

For the assembled crews, pressure escalated to quickly find the leak location.

Once the Pure mobilization crew set up the installation equipment and inserted the Sahara sensor, the pressure gauge indicated only 36 PSI, not the best scenario for leak detection. Furthermore, the inspection was heading uphill toward the area of interest, and could expect even lower pressure nearer to the suspected leak location area due to loss of head pressure as the pipe ascended the slope.

Further complicating matters, the pipe wall thickness was determined to be about 4 inches, and leak paths that pass through 4 inches of concrete and mortar can often include sharp bends that can muffle leak signatures.

From the insertion point, Sahara inspected a total of 2,400 feet, passing through the cul-de-sac area at around 1,600 feet from insertion.

Sahara platform inside a pipe filled with water

A slow pullback of the tethered Sahara tool to recheck areas of interest

During deployment, review of acoustic data noted a few areas of interest, but nothing definitive. The inspection continued past these areas of interest in the hopes of finding something more conclusive.  When nothing was found, the Pure crew began a slow pullback of the tethered Sahara tool to recheck the areas of interest.

One of the benefits of a tethered tool is that two inspection passes can be conducted on the same section on the same day.

Of the possible leak areas, one acoustic anomaly seemed promising, and that spot was marked above ground.

Since Pure could not get a consistent peak location, and since the audio lacked many classic leak characteristics, it was flagged as an anomaly on site. After review of the acoustic signature off site using advanced sound enhancing software, Pure Technologies was able to resolve the signature as a leak, and reported it as a leak to the City of Southlake.

Because this suspected leak did not, even in post analysis, present with all the elements of a leak signature, and because it lacked a distinctive peak location, Pure Technologies recommended that the City of Southlake check a 7-foot length of the pipe, all the way around the pipe.

Worker digging to reveal the leak

Surprise, surprise, 4 leaks verified

As directed, Southlake crews excavated the indicated areas and found not one but four leaks. The presence of four leaks in close proximity to one another, all at low pressure, explained the difficulty of finding a leak peak.

The four leaks located ranged from pencil-sized to quarter-sized. The sloppy mortar job over an access plate into the 42-inch Caylor Main was just good enough to help muffle the leaks, but not good enough to protect the cylinder from corrosion and eventual leakage.

Small leak before being fixed

In the end, despite difficulties of inspecting small leaks in a low-pressure environment, the inspection was deemed a success, and Southlake was extremely pleased with the accurate results.

Thanks to collaboration between crews from Southlake and Pure, the mystery leak was solved. The inline tethered Sahara tool came through again.

Big City Landscape View

Rand Water is the largest bulk water utility in Africa and one of the largest in the world, providing bulk potable water to more than 23 million people in Gauteng, parts of Mpumalanga, the Free State and North West – an area that stretches over 31,000 square kilometres. Rand Water’s distribution network includes over 3,300 kilometres of large-diameter pipelines.

In 2015 Rand Water embarked on the largest proactive bulk water pipeline condition assessment  investigation ever in South Africa. An important part of the assessment includes inline non-disruptive leak detection inspections covering just over 2,200 kilometers of Rand Water’s bulk pipeline network.

SmartBall in a case with the laptop used to control it.

SmartBall leak detection platform used for most inspections

The free-swimming SmartBall™ leak detection system is utilized to perform the majority of these inspections. The multi-sensor tool is used to detect and locate the acoustic signature related to leaks and gas pockets in pressurized pipelines. While the SmartBall is deployed, the pipeline remains in service, limiting disruption to customers.

Unlike traditional listening tools like correlators, which have limited success on large diameter pipes, the free-flowing SmartBall technology provides a high degree of accuracy, since as the ball rolls, it can inspect every inch of the main to detect leaks and gas pockets.

Big pipes

High pressure, high flow pipelines can make insertion and extraction difficult

Due to the vast transfer distances and varying topography within the supply area, the Rand Water system is characterized by pipelines operating under extreme pressures (higher than 16 bar [232 psi] and up to 40 bar [580 psi]) and high flow velocities (higher than 2 m/s), historically beyond safe operating limits of the standard SmartBall insertion and extraction equipment.

This rendered some of the pipelines unsuitable for inspection unless a solution could be found to safely insert and extract SmartBall from a high pressure/high flow pipeline.

Worker inspecting pipe

Pure works with SSIS PIpeline Services to help solve this unique challenge

Pure Technologies embraces research and development (R&D), with a strong design focus on continuously developing new inspection technologies and improve existing systems. SSIS Pipeline Services, which represents Pure Technologies in SA, challenged the Pure R&D team to find a solution for this unique high pressure Rand Water problem.

From this challenge, the Titan system was born.

Introducing Titan insertion and extraction system

Following extensive R&D and pre-delivery testing, the first-of-its-kind enlarged Titan insertion and extraction system was delivered to South Africa in May 2016. The system included a retrofitted high pressure LDEN (Large Diameter Extraction Net) kit capable for use in pressure environments up to 40 bar (600 PSI) and higher.

Workers with high pressure pipes

SSIS staff underwent shop training at the hands of one of the mechanical design engineers from Pure, followed by hands-on training on a number of high pressure, high velocity Rand Water pipelines.

To date, the Titan system has been used safely and successfully on pipelines up to 2900mm in diameter, operating at 2.5 m/s and at pressures up to 18 bar (261 psi). The system’s highest recorded operating pressure was at 23 bar (333 psi) on a 900mm diameter pipeline with 1.5 m/s flow.

Testing the waters, pushing the limits

The Titan system now enables SSIS to safely perform SmartBall leak and gas pocket inspections on high pressure pipelines previously off limits.

The latest successful test illustrates the SSIS commitment to the local water industry through innovation and dedicated support from Pure Technologies. It again proves that no problem is too big to solve, and every challenge can be overcome through dedicated teamwork and cutting-edge innovation.

Massive pressured water leak

According to AWWA’s 2016 Benchmarking Survey, the average water and wastewater utility has seven breaks per 100 miles of piping every year. Tip-top systems experience just four breaks in that distance, while those at the bottom have 18.

While it’s interesting to note the difference in break rates, it’s unfair to compare one utility to another, as a multitude of factors come into play as to why pipelines can deteriorate to state of failure. Countless sources of stress both inside and outside a pipe related to geographical location, soil-pipe type interactions, age, and construction are among factors that can take their toll on the pipe’s condition.

Worker inspecting pipe

For utilities, the one constant across the spectrum is the acknowledgment that simply replacing pipeline assets is cost prohibitive, and that advanced condition assessment services like those provided by Pure Technologies (Pure) can help utilities confidently make informed decisions that significantly reduce capital and operating costs.

Single-episode blowouts garner all the attention

While single-episode blowouts are quite rare, these tend to garner most media attention, and cause the most obvious blowbacks to the pipeline operator. What the public doesn’t usually notice are the pinhole leaks, hairline cracks, corrosion and leaking gaskets that tend to occur first.

Most catastrophic failures are caused by a sudden unexpected stress such as a water hammer acting on an existing weak point in the pipe. There is a widely held belief that the failure process is a simple one, where a pipe corrodes to the point at which it can no longer withstand the applied internal and external forces, resulting in a main break. However, research has shown that the failure process is more complex than expected.

Corrosion plays a significant role in water main failures, but soil-pipe interactions, manufacturing techniques and human error are also important factors. Failures also take place in multiple stages rather than in a single episode. Early damage not only weakens portions of the pipe, it also allows water to escape, causing corrosion and washing out of the supporting soil.

Broken water pipe on a street

Age alone does not indicate high-risk pipes

Pipes at highest risk are typically constructed using dated materials or methods, running through an area with heavy vehicle traffic. Urban centers typically represent significant loss potential from damage caused by water main breaks as a result of high-density buildings, underground infrastructure, important traffic thoroughfares, and economic loss potential of power, gas, water utilities and legal cases.

The net result is that age alone cannot be relied on as an indicator of a high-risk pipe.

Broken pipe

Types of pipe material and typical cause of failure

Prestressed concrete cylinder pipe (PCCP) has a unique failure mechanism: high strength steel pre-stressing wires that provide strength to the pipe can become distressed and reduce the structural integrity of the pipe. Broken wires can be caused by physical damage to the pipe, corrosion, or hydrogen embrittlement.

Areas of broken wires may be accompanied by leaks, especially in pipelines smaller than 48 inches in diameter, where the internal steel cylinder corrodes at the same rate as the wires or where water escaping through the joint encourages corrosion. Leakage has been proven to be a key indicator of structural condition in lined cylinder pipe, a type of PCCP in which the prestressing wires are placed directly on the steel cylinder. These types of leaks can create voids around the pipe and introduce added stress at an existing weak point.

Cast iron pipes corrode, become brittle and are prone to cracking. Many older North American cities have cast iron pipes that were installed in the 1800s, prior to the existence of pipeline standards, when methods of construction were non-uniform and advanced quality control programs did not exist. Consequently, many pipelines were installed using what are considered poor construction practices by today’s standards.

Ductile iron pipes have failure mechanisms similar to those of cast iron pipes; however they become less brittle and consequently degrade at a slower rate. These pipes may be capable of supporting large leaks for longer periods of time without failing immediately.

Plastic and polyvinyl chloride (PVC) pipes are less prone to corrosion and less brittle than iron pipes. Failures in these pipes are often traced to leaking joints where the escaping water creates voids around the pipeline, causing unplanned stresses on the pipe.

Steel pipes primarily fail due to loss of integrity at welds, and external corrosion causing severe pitting and weakening the pipe wall. Both losses of joint integrity and through-wall corrosion pits lead to leakage long before failure. Older steel pipes in aggressive environments are capable of sustaining massive levels of leakage for decades before failing.

Workers digging with mechanical shovel

Making ongoing condition assessment part of proactive asset management

While pipe material and typical pipe stresses are factors that can contribute to a state of pipe failure, it remains impossible to compare one pipeline to another, and to make generalized statements about remaining service life, especially based on age and depreciation. Instead, it pays to conduct ongoing condition assessment, and then to use that risk-driven asset data collection to reduce the likelihood of replacing pipe that can safely and effectively serve communities for several more years.

 commissioning of a 50 km AFO system on the Lake Huron Water System’s water main transmission pipeline

Last week, government officials, special guests and educators gathered in London, Ontario to celebrate the successful funding, installation and commissioning of a 50 km AFO system on the Lake Huron Water System’s water main transmission pipeline – a 1200mm diameter PCCP supplying more than 500,000 people in southwestern Ontario.

Optic Fiber inside a pipe and Press Conference

“The project was special,” said Mike Wrigglesworth senior vice-president at Pure. “We love partnering with forward thinking utilities like London Region to save money by using innovative technologies like the AFO system. Instead of budgeting for an expensive replacement program or dealing with disruptive bursts, London Region have saved millions of dollars by actually managing the pipeline.”

The event was covered by the London Free Press, which wrote the following story.

Water supply safeguard comes down the pipe

Now, we can keep an ear out for problems with a pipeline that brings fresh water to London. The city and region took the wraps off a new, fibre-optic cable installed in the water pipeline from Lake Huron to London with an announcement Friday at London Convention Centre.

If that pipe is about to break or leak, new monitoring technology will warn water watchers, preventing a ­rupture.

“We have an acoustic fibre-optic system that allows pipelines to be managed, identifying problems before they become bigger. When a pipeline fails, it is a big mess,” said Mike Wrigglesworth, senior vice-president of Pure Technologies, the Alberta firm supplying the cable.

Staff members behind an open pipe

The $7.5-million project has installed the acoustic cable on a 50-kilometre stretch between the Grand Bend water treatment plant and an Arva reservoir, covering seven municipalities, which are sharing the cost with Ottawa and the province.

The acoustic cable lets staff “listen” to the pipeline for steel wires snapping as the pipe breaks down. There are hundreds of such wires in each section of pipeline.

“One wire breaking in a pipe is no big deal, but 30 or 40 is a weak section of a pipeline,” Wrigglesworth said.

“It can inform which sections of pipe are deteriorating, in real time, and we can be pro-active,” said Wrigglesworth. “We can identify which sections of pipe have a problem and make a plan to repair.”

A repair might cost $75,000, a “huge savings” over the cost of fixing a rupture, which could run to as much as $1.5 million, he said.

The Lake Huron-to-London pipeline has broken twice, in 2010 and 2012.

Under the new system, “We will get an email to say a section of pipe has a break, they even give us the map location of where it happens,” said John Walker, operations manager for the Lake Huron and Elgin area primary water supply, which oversees the regional and city water system.

“At some point, we will have to extend this (acoustic cabling) to Lake Erie,” Coun. Harold Usher said of the city’s other water supply pipeline. “Everything we do in one, we will do in the other. We cannot have farmer fields flooded.”

The $7.5-million upgrade to the Lake Huron-to-London water line is part of $179.1-million in water safety infrastructure investments across Southwestern Ontario. The federal and provincial governments are paying about $50 million each, with municipalities picking up the balance. In all, eight projects will be completed by 2017.

Celebration Cake

In preparing for its water future, the Region of Peel (Peel) adopts a unique assessment strategy for a newly constructed potable water transmission main that extends deep underground through the heart of Peel Region. The effort is paying off, with Peel decision makers gaining a better understanding of this pipeline as it comes into service.

Working on a new potable water transmission main

Peel Water & Wastewater services approximately 1.3 million residents and 88,000 businesses in Brampton, Caledon and Mississauga. The Hanlan Water Project is the largest water pipeline capital initiative ever undertaken by Peel, with a cost of approximately $500 million. The completed transmission and sub-transmission mains included in the Hanlan Water Project will serve Peel’s growth projections for the next two decades.

The project includes 15 km of 2400mm (96-inch) PCCP water transmission main. Construction began in 2011 and is scheduled for completion by 2017. The project is split into three contracts and construction includes both tunnelling and open-cut methods.

Outside and inside a tunnel

Some pipeline sections tunneled in excavated depths of 50 meters

The project is unique from the point of view that the majority of the pipeline will be built under existing infrastructure, with some sections of pipeline tunnelled in excavated depths up to 50 meters (150 feet).

Peel has encouraged the use of technology and innovation throughout this project and has included innovative assessment strategies by Pure Technologies prior to pipeline commissioning. Baseline condition assessment and real-time monitoring technologies have offered value, and peace of mind to Peel managers and decision makers involved with this project.

SoundPrint® acoustic fiber optic (AFO) inside a pipe

Acoustic monitoring versus electromagnetic inspection technology

Pure’s baseline condition assessment includes visual inspection, 3D inertial mapping, electromagnetic (EM) inspection where applicable and SoundPrint® acoustic fiber optic (AFO) monitoring the pipeline during hydrostatic pressure testing of the pipeline. The project includes a continuous monitoring solution once the pipeline is commissioned into service, expected in 2017.

AFO monitoring is an innovative monitoring technology for identifying wire breaks in PCCP pipes. Unlike EM, which identifies the number of wire breaks that exist at a point in time, acoustic monitoring identifies the number of wire breaks that occur during the monitoring period, effectively identifying the location of active deterioration for the lifespan of the asset.

By ‘listening’ for wire breaks, pipes that are approaching failure can be identified and rehabilitated. With the installation of AFO technology at the time of construction, Peel ensures active management of their most valuable buried assets, for the life of the asset.

“A snapping wire or two won’t sound an alarm bell,” says Adam Koebel on behalf of the Data Analysis Group at Pure. “But when our monitoring team notices a large number of pings from the wires breaking in a concentrated location, that’s when we focus attention on the acoustic anomalies to determine whether remedial action needs to take place.”

The project was split into 3 contracts with varying scope per contract

The 15 km of 2400mm PCCP project was split into 3 contracts with different general contractors, and complimentary scope per contract.

Pipeline construction along a road

The acoustic monitoring covered a distance of 1,138 meters and spanned a total of 132 pipe sticks. Analysis of the data recorded during the pipeline monitoring found two (2) acoustic anomalies consistent with wire wrap breaks, which amounts to a negligible amount of change or distress. Pure conducted a second (post pressure test) EM scan to confirm the AFO testing and determine the presence of pipe wall distress.

Contract 1 (underway) includes visual inspection and mapping

Pure’s involvement in Contract 1 began in 2016, with a visual and sounding inspection of 5.87 km of the 2400m PCCP pipeline and included identifying potential joint defects and other signs of distress, as well as verifying lay schedule from within the pipe. AFO monitoring will let Peel and their contractor know if any distress occurred during hydrostatic testing.

Contract 3 is on schedule to wrap-up in 2017, while Contract 4 scope of work will include final disinfection and commissioning of the new feedermain.

Once a baseline condition has been established, the AFO system will allow Peel to track the deterioration rate and identify at-risk pipes before they fail.

For Peel, acoustic fiber optic monitoring is like preventative medicine, and as a safeguard, it’s proven to work.

Fiber optic

24-Detector PipeDiver tool

Advanced PipeDiver tool developed for condition assessment of metallic pipes.

Pure Technologies (Pure) never says no to an engineering challenge. If a client has a particular pipeline assessment or monitoring challenge to overcome in order to make a rehabilitation decision, we’ll do whatever it takes to help our clients solve the problem.

Pure Technologies embraces research and development (R&D), with a strong dedication to continually develop new technologies and improve upon existing inspection systems. This attitude of taking a winning platform and making it better was demonstrated again with the introduction of the optimized PipeDiver, an advanced, multi-sensor tool developed specifically for the condition assessment of metallic pipes within pressurized pipe networks.

PipeDiver inspection tool operates while the pipeline remains in service

As a technology platform, PipeDiver is a versatile, free-swimming condition assessment tool that operates while the pipeline remains in service, often providing an easier and less costly alternative than inspection methods that require a shut-down or dewatering.

Two men working with a PipeDiver device

The PipeDiver platform is ideal for critical, large-diameter lines that cannot be removed from service due to operational constraints or lack of redundancy. The PipeDiver tool requires only a 12-inch access, and can be deployed on pipelines that range from 16 inches up to 120 inches.

The tool can be deployed, collect information on pipeline condition and extracted in a single mobilization.

As the PipeDiver platform can be equipped with a closed circuit television (CCTV) camera, the tool is able to record and deliver video images from the inside of the pipeline (quality depends on water clarity).

PipeDiver Cammera working

Tool able to navigate most butterfly valves, tees and pipeline bends

To begin an inspection, the tool is balanced to be neutrally bouyant and inserted into a pressurized or depressurized pipeline through a tap connection, or an existing access point. The tool travels with the product flow, and utililzes flexible petals to navigate butterfly valves, tees and bends in the pipeline.

Originally designed for use in pressurized concrete cylinder pipes (PCCP), the tool has specialized electromagnetic sensors (PureEM) to identify and locate broken prestressing wire wraps, (one of the main structural components and failure modes of a prestressed concrete pipe).

Historically, technologies available to assess the condition of metallic pipe have been full diameter tools (“Smart Pigs”) unable to traverse most water or wastewater pressure pipelines due to inline valve restrictions and limited access for insertion and retrevial of a full diameter tool. These challenges led Pure’s R&D to develop the specialized PipeDiver for metallic pipes, equipped with advanced electromagnetic technology to identify localized areas of wall loss.

The PipeDiver electromagnetic (EM) technology can also be used in bar wrap pipelines to identify broken bars and steel cylinder damage, the two main structural components bar wrap pipe.

PipeDiver device inside a pool of water

Utilities Kingston welcomes PipeDiver to assess its metallic pipeline

Since its introduction, the optimized PipeDiver platform has been deployed for various projects in Europe, Canada and the U.S.

This year Utilities Kingston agreed to pilot the new technology as part of a comprehensive condition assessment on its Dalton Avenue (North End) Pump Station Force Mains. The pipelines are both approximately 1,550 meters long and follow a parallel route for approximately 1 kilometer.

The older of the two force mains is 450 mm (18-inch) in diameter, constructed of ductile iron built in the late 1950s, and had failed several times over its lifetime. The newer of the two force mains is 600 mm (24-inch) in diameter, built from an unspecified concrete pipe from the early 1960s. As the pipe material specifics were still unknown at the time of the inspection, the Pure elected to conduct a PipeDiver run to accommodate both possible types of pipe material – assumed by all to be bar wrapped pipe (BWP) and prestressed concrete cylinder pipe (PCCP).

Force main defects can vary from one pipe material to another

During a forensics exercise on the 600 mm force main using earlier PipeDiver technology, it was revealed that the actual pipe material included 102 suspected metallic pipes, which were not identified as such in the original plan and profile drawings.

This included ductile ironsteel and unexpectedly, reinforced concrete pipe (RCP), which is not usually used in pressurized environments. Electromagnetic inspection of the RCP can only reveal anomalies on the circumferential cage and not the longitudinal bars.

Inserting the PipeDiver device through an inspection hole

Optimized PipeDiver tool deployed in wastewater

Pure deployed its optimized PipeDiver tool to conduct a quality analysis of the 450 mm pipe. The purpose of the inspection was to locate and identify steel and ductile iron pipes that have indications of wall loss.

This marked the first condition assessment of metallic pipe using the optimized PipeDiver in wastewater, an exercise that confirmed the validity of the tool’s sensor technology.

Results lead to actionable information regarding rehabilitation

Of the 650 pipes inspected with the PipeDiver tool, a total of 55 pipes in the 450 mm Dalton Avenue Pump Station Force Main had electromagnetic anomalies characteristic of localized wall loss.

The data collected gave Utilities Kingston a better understanding of their real, not assumed assets. The results, which included a DIP risk of failure analysis, were used to complete a structural evaluation of the force mains, and have provided UK with actionable information regarding any necessary repairs or rehabilitation.

PipeDrive device revision after the inspection has finished
City of Vancouver from the air

With its Pacific Ocean entranceway and towering backdrop of snow-dusted mountains, it’s no wonder the City of Vancouver ranks among the most laid-back, beautiful cities in Canada, and indeed, the world. Water is in its blood.

This spring the coastal seaport city retained the services of Pure Technologies (Pure) to perform a condition assessment and risk analysis of the Powell-Clark Feeder Main, part of the city’s water system that daily delivers 360-million liters of high-quality water throughout the city. During the course of the assessment, the inspection team had to deal with unexpected challenges, but in true West Coast spirit, collaboration between the inspection teams led to success.

Over five days in March 2016, Pure performed an electromagnetic inspection of the subject pipeline utilizing its free-swimming PipeDiver® platform, and an acoustic inspection using its free-flowing SmartBall® inspection tool. Pure also monitored this feeder main using a Transient Pressure Monitor for three months prior to the previous two inspections.

PipeDiver device

PipeDiver inspection identifies electromagnetic anomalies

The Powell Street Feeder Main is comprised of prestressed concrete cylinder pipe (PCCP), ranging from 750 to 900-mm in diameter. The Clark Drive Feeder Main consists of 750-mm of bar wrapped pipe (BWP).

The PipeDiver electromagnetic inspection covered a cumulative distance of 4.57 kilometers and spanned 676 pipes. Unlike more restrictive assessment tools, PipeDiver is a flexible, free-swimming tool that flows with the product and is able to easily navigate through most butterfly valves, apertures and bends in the pipeline, delivering electromagnetic (EM) data for a variety of pipe type and materials.

EM technology provides prestressing wire-break estimates on each individual section of PCCP, which is the best indicator that this type of pipe will fail. This allows for one deteriorated pipe to be identified within an entire pipeline that is in good condition overall, and also provides the baseline condition on all pipes in the inspected distance.

Analysis of the data obtained during the inspection determined that one (1) pipe (less than one percent of the pipeline) in the 750 mm Powell-Clark Feeder Main displayed electromagnetic anomalies consistent with 30 broken prestressing wire wraps. This is well below the average distress rate observed by Pure Technologies in PCCP pipelines, which is 3.8 percent of pipes in structural distress.
SmartBall with case and insertion tools

SmartBall inspection tool used to locate leaks and gas pockets

In addition to the EM inspection, Pure also performed a SmartBall inspection to identify and locate leaks and pockets of trapped gas along the pipeline.

Unlike traditional external listening tools with limited success on large diameter pipes, free-flowing SmartBall technology provides a high degree of accuracy, since as the ball rolls, it can inspect every inch of a water main to detect leaks and gas pockets.

The SmartBall tool was inserted into the pipeline through a flange access and acoustic and sensor data was collected and recorded as the tool traversed the pipeline. At a distance of 5.8 kilometers, (only 470 meters from the end of the inspection run), the tool stopped tracking.

Crews from the City and Pure put their heads together to solve the problem.

ROV camera shows a tool cart inside the pipe

Collective thinking clears the debris and all is well

By analyzing data from the earlier PipeDiver inspection, Pure determined that unknown debris likely lodged the SmartBall tool.

The City excavated and modified a tap to allow Pure to access the pipeline with a submersible ROV (equipped with a camera) to retrieve the SmartBall tool and examine the debris, which turned out to be an old forgotten tool cart. The cart and SmartBall tool were extracted, the data was evaluated and considered valid, and all was good.

From the SmartBall data, Pure Technologies detected three (3) anomalies characteristic of leaks and zero (0) acoustic anomalies characteristic of pockets of trapped gas.

While no gas pockets were identified during this inspection, two (2) instances of entrained air were identified as migratory acoustic anomalies, and flagged for future inspection, as they may develop new pockets of trapped gas.

Validated results help the City manage its infrastructure

In spite of the cart debris blocking the SmartBall tool during the last few meters of its long inspection journey, the data collected during the pipeline assessment was analyzed as valid.

When combined with the results from the PipeDiver EM inspection, the condition data will be used as part of the City of Vancouver’s asset management initiative and allow for proactive measures in the assessment and management of their infrastructure.

At Singapore International Water Week 2016, one of Pure`s licencees presented a poster on two acoustic-based technologies (tethered Sahara® and free-swimming SmartBall®) used to locate 674 leaks on large-diameter trunk mains operated by this Malaysia water operator.

Conducted over four months, the in-line inspection and resulting repairs has saved total of 46.7 million liters of water daily. The pipe diameters ranged from 300mm to 2,200mm.

 

SmartBall in-line leak inspection platform

The SmartBall tool was chosen as an inspection platform for its sensitivity to small leaks, minimal pipeline modifications required for insertion and extraction and ability to inspect long distances in one deployment. The free-swimming, acoustic-based SmartBall assembly is inserted into the flow of a pipeline, traverses the pipeline, and is captured and extracted at a point downstream.

Sahara in-line leak detection platform

The tethered Sahara tool includes an acoustic sensor to perform leak and gas pocket detection, a high-resolution video camera to assess internal pipe conditions, and an electromagnetic sensor to identify stress in the pipe wall. Because the parachute-like tool is drawn by product flow and is tethered to a data acquisition unit on the surface, it gives the operator close control to confirm suspected leaks, gas pockets and other pipeline anomalies.

 

City of Montreal Skyline

The City of Montreal believes that the best medicine is preventative medicine, especially as it applies to its water network.

Montreal has an impressive water system that supplies drinking water to a population of nearly 1.9 million people. Since 2002, the historic city, the second largest metropolis in Canada, began a long-term major rehabilitation of its extensive network of water main (770 kilometers) and distribution pipes (4,600 kilometers).

In 2015, as part of a pre-emptive program to reduce loss of non-revenue water, the City partnered with Pure Technologies (Pure) to conduct an ongoing, three-year leak detection survey on a series of critical pipes within its network, several of which are located in the downtown core.

Inserting tools through inspection hole in a street

Stopping small leaks from developing into major breaks

The City recognized the value of detecting leaks, however small, to prevent these from developing into greater problems. Compared to a major pipe rupture, which can cause catastrophic damage and incur immediate excavation and costly repairs, small leaks are less obvious at first, and can seep underground for some time without obvious detection.

In addition to physical losses of water caused by a series of small leaks, the escaping non-revenue water can eventually erode the surrounding soil making the area more prone to washouts or sinkholes, a major headache especially in densely populated areas. Unplanned excavations to repair unforeseen leaks can also erode consumer confidence in a public utility.

Leak detection strategy includes Sahara acoustic video inspection

For its multi-year leak detection program, the City requested Pure to deploy its highly reliable and precise Sahara® acoustic video inspection on 46 kilometers of pipelines chiefly in the downtown core. The pipeline sections consist of bar wrappedsteel and cast iron pipe.

The Sahara platform is modular, and can be configured with a variety of sensor tools to perform the condition assessment. This includes an acoustic sensor to perform leak and gas pocket detection, a high-resolution video camera to assess internal pipe conditions, and an electromagnetic sensor to identify stress in the pipe wall.

Because the Sahara tool is drawn by product flow via a small drag chute, and is tethered to a data acquisition unit on the surface, it gives the operator close control to confirm suspected leaks, gas pockets and other pipeline anomalies. The tool can visually confirm pipe irregularities, continuously recording, allowing for both real-time and post-processing analysis.

Workers during Sahara device insertion

 

Data used to shape urgency and timing of rehabilitation efforts

For the Montreal project, the purpose of the Sahara inspection was to assess the condition of the pipeline by identifying and locating leaks, pockets of trapped gas and to identify larger visual anomalies utilizing Closed Circuit Television (CCTV) footage collected during the inspection. The data would help shape the rehabilitation urgency and timing.

To date, a total of 13.2 kilometers have been assessed. Analysis of the data identified eight (8) leaks and zero (0) gas pockets in the pipeline sections inspected. The Sahara sensor was tracked above ground using the Sahara Locator device to pinpoint in real time the location of any potential leaks or anomalies.

The leak detection program has not been without challenges. Valve operations were needed to achieve required pressure flows, and mobilization had to be based on hours of demand, and inspections conducted during those hours.  A number of tight chamber clearances meant the creation of new insertions taps, and because of the urban environment, markings had to be precise, and crews had to deal with traffic issues.

Despite challenges, the assessment is proving its worth from a verification viewpoint, and the leaks have been either repaired or addressed for prioritization. The current program is scheduled for completion by 2017.

With its pre-emptive leak detection program, the City is Montreal is a great example of a smart water manager taking proactive efforts at keeping its network in healthy shape.

Traditional methods of wastewater condition assessment focuses almost exclusively on the gravity system and valve
actuation, using tools such as smoke testing, CCTV, and zoom cameras. While effective on gravity mains and valves,
these methods are not applicable in force mains.

Inspecting force mains is more challenging due to lack of redundancy, lack of access points, cost, technology limitations, while the consequence of force main failures can be significant financially, environmentally and socially.

A successful wastewater asset management program uses a holistic approach which prioritizes the entire system, collects data through condition assessment and provides analyzed reports in order to develop a targeted, informed action plan for long-term sustainability of a collection sewer system.

Flower Mound Sign

Named for a prominent landmark mound with more than 175 species of wild flowers, the Town of Flower Mound is ranked as one of the ten best places to earn a living and raise a family in Texas.

To complement these natural and economic positives, the scenic Town of 70,000 is also known for its municipal water stewardship and proactive approach in maintaining the quality of its buried infrastructure. This includes 430 miles of water mains and 230 miles sewer pipes serving 22,000 residential and industrial connections.

As part of the ongoing program for condition assessment of its buried infrastructure, the Town recently retained the services of Pure Technologies U.S. Inc. (Pure) to conduct a Sahara® leak and gas pocket detection inspection of approximately 21,200 feet of the Potable Water Main (PWM), which connects the Pintail Pump Station to the Waketon Water Tower. Constructed in 1973, the critical section of 20-and 30-inch pipeline is comprised of bar-wrapped (AWWA C303)steel and ductile iron pipe.

“Most pipelines are designed for 50 to 75 years expectancy, and service life can vary depending on factors such as depth, soil conditions and pipe material,” said Randy Williams, Utility Services Manager of Flower Mound Public Works (FMPW) District. “Rather than waiting for breaks to happen, the Town strives to assess the condition of the assets before that happens.”

The Sahara inspection followed a structural assessment using a PipeDiver® inspection of this same pipeline conducted one month earlier and covered many of the identical pipeline sections. FMPW chose CCTV inline video and enhanced electromagnetic (EM) assessment to provide a comprehensive condition assessment.

PipeDiver platform carried to the insertion point

Pure’s free-flowing PipeDiver platform, which preceded the Sahara inspection along the same pipeline, is being carried to the insertion point.

Detecting small leaks with Sahara inspection platform

The Sahara® pipeline inspection platform is one of the most accurate tools available for leak detection, gas pocket detection, and locating structural defects in complex networks of large diameter water and wastewater pipes.

The tethered tool is capable of locating very small leaks typically within 1.5 feet (0.5 meters) of their actual location. The tool also features inline video that allows operators to observe internal in-service pipe conditions.

Added value: Flower Mound inspection included design and installation of taps

The insertion locations for the Sahara inspection were dictated by the previous PipeDiver inspection, which indicated a large number of bends and long distances to cover with less than ideal access.

In light of the limitations, and within a very short time frame, Pure took on the responsibility to manage the tapping process in-house, including the design, excavation and installation of the taps to insert and extract the Sahara tool from the pipes. Although this task was atypical of work normally provided, it is an example of the added value Pure can bring to a project.

Detected: one leak, one large gas pocket, plus improved GIS information

It’s still early in game, and the electromagnetic results have yet to be fully evaluated. Nonetheless, the Sahara inspection detected a leak on an undocumented offtake installed on pipe suspected to have been blanked off and buried, and now leaking.

In addition to pinpointing the leak and gas pocket, the condition assessment located an additional six undocumented outlets the Town was previously unaware of, leading Pure and FMPW to surmise that the outlets were installed and equipped with blind flanges for future expansion. Additionally, during this inspection, sections of pipeline alignment were discovered to be quite different than what FMPW expected.

FMPW now has a true comprehensive condition assessment of their pipeline that includes GIS quality mapping, video inspection and recording of the pipeline interior, leak and gas pocket identification and repair, and assessment of the structural integrity on a pipe-by-pipe basis — allowing for localized verification and repair. Overall, GIS information has been improved, with location and images of possible leaks, defects or anomalies.

“The proactive approach we’re taking allows us to predict water main breaks, which improves our reliability of service,” said Williams. “When you locate a defect, you can schedule a repair, notify people, and get it done at the right time of day, and at a schedule of our choosing. Everybody benefits.”

Randy Williams, Utility Services Manager of Flower Mound Public Works (FMPW) District, talks about the Utility’s approach to condition assessment.

Utilities Complete Condition Assessment Of Bar-Wrapped Pipe With Smartball®, Pipediver®, And Robotic Platform Tools

By the early 1940s, cast iron pipe was losing its historic cachet as the go-to material for new buried infrastructure. Cast iron’s replacement was bar-wrapped pipe (BWP), and it quickly gained acceptance as a reliable, durable and cost-effective pipe material for use in large-diameter transmission and sewer force mains.

Typically, BWP consists of a welded steel cylinder with reinforcing bars wrapped around the cylinder to provide strength. An internal concrete lining and external mortar coating provide corrosion protection to the steel components. The watertight membrane enables the composite pipe to withstand high internal pressures and the effects of external earth and traffic loads.

Until recently, BWP condition assessment proved difficult

Despite early adoption from many pipeline operators, the downside to BWP has been the difficulty to assess the pipe’s condition, where failures are often precipitated by deterioration of the reinforcing bars and long periods of leakage that often go undetected.

It’s now 70 years later, and the methods to assess the condition of bar wrapped pipe have only been recently developed and commercialized. On this forefront, Pure Technologies is recognized for its toolbox of condition assessment technologies that can identify broad areas of cylinder corrosion and bar breaks.

Two Texas cities join forces to assess shared BWP water supply line

In one specific case, the city of Irving and a partnering agency in North Texas joined together to initiate a condition assessment project of their shared water supply line, made up primarily of bar-wrapped pipe. Constructed in 1955, the 48-inch Jamison Water Transmission Main is a critical non-redundant pipeline that conveys potable water to a combined population of 400,000 residences within the Dallas Fort-Worth Metroplex.

The two agencies worked side by side to implement an Assess and Address™ pipeline inspection protocol to determine the condition of the pipeline and to increase the utilities’ reliability of water delivery.

The condition assessment utilized inline acoustic leak and air pocket detection, robotics with high definition CCTV and enhanced electromagnetic detection, transient pressure monitoring and non-linear Finite Element Analysis (FEA) of the steel cylinder corrosion and broken bar wraps.

The results concluded that 97 percent of the 583 pipes inspected had no detectable damage. Less than 3 percent of the total pipes inspected exhibited minor distress, of which 15 (2.5 percent) pipes exhibited thinner steel cylinder.

Through close collaboration, the two agencies were able to effectively manage a shared asset with the goal of preventing disruptive and expensive pipe failures. The information gained from the assessment will allow for the implementation of a cost-effective, long-term management plan to extend the life of the pipeline.

Trinity River Authority of Texas (TRA) evaluates 8.8 miles of critical BWP transmission main

In a second case involving BWP, Pure collaborated with Trinity River Authority on assessing the condition of a pipeline that is a critical link in the reliable delivery of drinking water to five cities within the Dallas-Fort-Worth Metroplex. The aging pipeline was scheduled for replacement due to previous failures and inability to be removed from service for repairs.

To understand the overall pipeline condition, TRA contracted Pure to inspect and evaluate the pipeline by conducting comprehensive hydraulic, leak detection and condition assessment on 8.8 miles of the 30-inch bar-wrapped pipe.

For the leak and air pocket assessment, TRA used the SmartBall® inspection tool, a non-destructive, free-swimming technology that measures the acoustic activity associated with leaks and gas pockets in pressurized pipelines. Regular leak detection inspections can help utilities identify leaks that may not be visible at the surface.

Increased reliability, reduced capital costs

For the structural inspection, TRA used PipeDiver®, a free-swimming electromagnetic tool that identifies bar breaks and broad areas of cylinder corrosion in BWP using PureEM technology while the line remains in service.

The inspection of the BWP identified 14 pipes with bar break damage and 72 pipes with electromagnetic anomalies resembling cylinder defects out of 1284 inspected pipes. By repairing specific pipe sections with deterioration, TRA was able to avoid replacing the entire pipeline at a high capital cost and continue providing reliable service to customers in the region.

This notion came to life in a North American survey conducted in 2014 and published online this year in The American Water Works Association Journal on current sustainable infrastructure practices among water and wastewater utilities.

Authored by associate professor Amy Landis, the survey found that of the 125 American utilities that responded, less than half “failed to implement some form of sustainability practice, which ranged from renewable energy to infrastructure repair to demand management. Of the respondents, only 18 percent of utilities reported publishing a sustainability policy or vision.”

Surprising results in spite of critical importance

The results are rather surprising, considering that sustainable water infrastructure is critical to providing the American public with clean and safe water. The American Society of Civil Engineers (ASCE) gives drinking water and wastewater infrastructure a “D” grade, which puts the infrastructure in “poor and at risk” with most of the assets approaching end of service life, some reaching the age of 100 years old or more.

For combined water and wastewater utilities, the most common selected metric to evaluate sustainability practice was “water consumption and/or water delivery efficiency” at 63 percent. Coming in second for sustainable infrastructure practice was “employ trenchless pipe repair and/or rehabilitation.”

Old main

Buried assets are approaching end of service life, some reaching the age of 100 years old or more.

Helping water utilities embrace sustainability

The good news is that it is easier today for public water utilities to move forward on the path to social, environmental, and economic sustainability. Modern inline technologies and precise data analysis tools certainly help the effort.

For more than a decade, Pure Technologies has played a key role in helping progressive utilities follow through with actions to promote sustainable practices for their water and wastewater infrastructure.

Sustainable practices include helping pipeline owners optimize capital and remaining useful life as they seek to more efficiently manage their assets.

As a trusted global leader specializing in the assessment, monitoring and management of pressurized pipelines, Pure has completed structural condition assessment on more than 8,000 miles of critical water mains. This has helped utilities avoid critical pipeline failures that can be expensive to remediate and damaging to their reputation. In addition, Pure has located more than 4,000 leaks on mains using inline leak detection. Through these activities, billions of gallons have water have been saved through repaired leaks and avoided pipe failures.

Pipe Surface Inspection

By understanding the operational conditions in their system, utilities can develop a defensible plan for managing their infrastructure.

Capital savings can be invested back into the system

The numbers continue to impress. Based on Pure’s condition assessment data, we have found that 96 percent of pipe sections do not have any deterioration at all and are in “like new” condition, while less than 1 percent of pipe sections require immediate repair. This is comforting information to utilities with aging pipelines still in operation, as is the case with the remarkable cast iron water main buried in 1831 beneath what is now Greenwich Village.

By identifying and repairing isolated sections that require intervention followed by a long-term management strategy, a utility can realize major capital program savings over replacement or large-scale rehabilitation. On average, a utility owner can proactively manage a pipeline for 5 to 15 percent of the capital replacement cost. The money saved can be invested to fix and sustain other parts of the system.

The U.S. EPA and ASCE estimate the funding costs associated with buried infrastructure ranges from more than $200 billion to 1 trillion over the next 25 years. The numbers are staggering. Pure Technologies is helping utilities manage their buried infrastructure through its Assess and Address™ approach to pipeline management, and as result, has saved clients hundreds of millions of dollars in replacement costs.

Public pressure to do the right thing

With drought, climate change and water conservation now part of the daily conversation, the pressure is on for public utilities to incorporate sustainable practices into their planning. It’s the right thing to do, from an economic, environment and social standpoint.

By having a strong understanding of the risk and operational conditions of different areas in their system, an appropriate and defensible inspection plan can be developed. This process allows utilities to develop a sustainable long-term strategy for managing their infrastructure well into the next century.

Water and sewer utilities across North America are facing a major funding gap related to their buried pipeline infrastructure. Based on current estimates, utilities do not have enough capital available to fix or replace their aging assets. In addition to the funding gap, utilities are under scrutiny because of increased incidences of pipeline failures that are disruptive to communities and expensive to mitigate.

This new reality has forced utilities to squeeze more remaining life out of existing assets, creating more demand for condition assessment programs that allow utilities to identify specific areas of damage and selectively repair pipelines in favor of full replacement.

Historically, condition assessment has been in the realm of a few specialized firms that respond to high profile pipeline failures; however, the industry has changed and condition assessment is becoming widely used and trusted. This approach has been adopted by many utilities that have successfully managed risk and extended the life of assets for a fraction of the cost of a replacement program.

According to a study by Pure Technologies, the majority of pipelines 16 inches and above can be cost-effectively managed for between 5 and 15 percent of the replacement cost. The study found that pipeline damage is typically not systematic across an entire pipeline, but is usually localized due to factors such as design, manufacturing, installation, environmental, operational or maintenance factors.

Equipped with this information, utilities can be assured that assessing the majority of their mains before replacement can reduce their infrastructure gap and extend the useful life of assets.

However, one question that often gets asked about condition assessment programs is how a utility should choose the right condition assessment solution.

The easiest way to solve this challenge is to employ a risk-based approach to condition assessment using a variety of tools that offer different resolutions.

Staff inserting tools

Defining Risk and Pipeline Priorities

Risk is a measure of the probability and consequence of uncertain future events, in this case, potential pipeline failure. A basic approach can be used to define risk even in complex systems; simply, risk is a product of Consequence of Failure and Likelihood of Failure (CoF x LoF).

Consequence of Failure (COF) refers to the damage a failure would cause based on factors like its location, the amount of users it supplies, and its size and operating pressure. Likelihood of Failure (LOF) refers to the probability of a failure occurring based on factors such as age, pipe material, soil conditions, operating pressure, failure history, among others.

Generally, the Consequence of Failure is well defined by the potential damage a pipeline failure would impose on the surrounding environment and is generally fairly static – or – once defined, it is unlikely going to change rapidly.

With this in mind the key to managing risk, or the possibility that a pipeline could fail, is in understanding the Likelihood of Failure. This can be achieved by quantifying the physical condition of the pipeline and understanding and quantifying the factors that affect the potential for deterioration of the assets.

Once risk is defined, the pipeline inventory can be prioritized which helps in the selection of condition assessment approaches and the application of the appropriate technologies. In general, high-risk pipelines warrant a detailed assessment while low risk pipelines can use lower resolution alternatives.

Using Risk to Select Condition Assessment Techniques

When selecting condition assessment techniques, qualifications and technical judgment should be used in lieu of price. High resolution tools come with a higher cost, but saving money on a low resolution condition assessment is not a responsible alternative for a high-risk main.

For example, the savings gained by selecting a low resolution technology for a large-diameter pipeline with a high CoF are often miniscule in comparison to the repair and capital programming decisions that result from the low resolution condition assessment data. If the data is inconclusive or inaccurate, a utility may unnecessarily invest millions in a capital replacement program that was not required, easily eliminating the savings achieved by selecting the less expensive condition assessment option.

Tech monitoring results

Additionally, the cost of a failure should be considered when selecting a lower-cost assessment for a critical pipeline. The average cost of a large-diameter pipe failure is between US $500,000 and $1.5 million; money saved on lower-resolution assessments can easily be negated by the cost of mitigating a single failure and the resulting reputational damage.

One method of selecting a technology is to compare uncertainty to risk. As mentioned earlier, risk is a measure of the probability and consequence of uncertain future events. When dealing with a high-risk asset, it is important that the solution allows the utility manager to minimize the uncertainty of the condition assessment. More importantly, it is crucial that the utility manager knows the condition of the asset to the best extent possible, particularly in areas where there is a high Consequence of Failure.

Pure Technologies has a suite of condition assessment tools with different resolutions. Our low resolution solutions can provide basic condition data on leaks, air pockets and areas of pipe wall stress that could represent damage. This is a valuable prescreening option for high-risk mains, or alternatively for lower risk mains, can be enough detail for a utility to manage the asset.

Pure’s medium and high resolution tools provide more comprehensive data for higher risk pipe. Our high resolution tools can provide detailed accuracy, for example, locating small pits on metallic pipe. The data collected from both medium and high resolution tools is often used by utilities to create rehabilitation plans for critical mains.

Regardless of the solution provider, it is important that utilities employ a balanced, risk-based approach to condition assessment that uses appropriate tools. The most important factor a utility owner can remember is that there is no silver bullet to assess an entire system.

Small leaks sink big ships – the same can be said for large-diameter pipes in utility networks. While large leaks or ruptures are seen as newsworthy stories accompanied by images of water flowing down the streets; smaller leaks can often be more devastating. Left undetected, they can add up over time, contributing significantly to Non-Revenue Water, and eventually, they too can lead to catastrophic pipeline failures.

Many utilities focus leak detection efforts on locating and repairing large leaks, with less priority being placed on identifying smaller ones. While repairing these large leaks is integral to preventing major failures that are expensive to the utility and disruptive to the surrounding environment; finding and repairing small leaks may present the best opportunity for long-term reduction of NRW loss.

Non-Revenue Water loss in the United States is estimated to be between 14 and 16 percent on average, while some systems are suspected to have revenue loss of up to 40 percent. In developing countries this number is much higher, with NRW loss as high as 65 percent in some areas.

The Benefits of Finding Small Leaks

Identifying and repairing small leaks early in their life may be the best course of action to address the problem of future water loss. Catching a leak while it is small prevents decades of sustained water loss that may not otherwise be detected. Over the years, unreported water loss could mean significant financial loss for the utility. Additionally, utilities that fail to proactively find and fix unreported water main leaks allow a growing backlog of new leaks to occur slowly over time. The result is mounting water loss volumes and “hot spots” in some locations; as a number of small leaks can ultimately lead to a major pipeline failure.

Acoustic leak detection sensors have been developed to run through in-service water trunk mains, bringing the sensor to the leak sound, rather than relying on the leak sound to find the sensor. Inline surveys work exceptionally well on large-diameter water transmission trunk mains, which are often poor at transmitting leak sounds and have limited access points to the pipe.

Inline Leak Detection Case Studies

Inline leak detection services have been proven to reliably identify very small leaks on water trunk mains with pinpoint precision, without requiring the water main to be taken out of service.

Engineering staff from Metropolitana Milanese in Milan were able to reduce their water loss and renew the condition of one of their critical mains by conducting proactive inline leak detection using Pure Technologies’ SmartBall® inline leak detection tool. They found a concentration of eight small leaks in a 240 meter section of pipe, exposing a weak area of pipe that could eventually lead to a critical failure. Metropolitana Milanese was then able to take proactive measures to defend against major ruptures.

SmartBall with case and insertion tools

The SmartBall tool is a free swimming leak detection technology that follows the product flow of the pipeline, picking up acoustic anomalies that identify and locate very small leaks and gas pockets. Because it has very little operational noise, the sizes of the detected leaks are minute. In optimal operational conditions leaks as small as 0.028 gal/min have been detected.

With the ability to detect even smaller leaks at 0.005 gal/min (in optimal conditions), Pure Technologies’ Sahara leak detection platform is another tool that can be deployed. Because it is a tethered system that is operator controlled, it is also able to map the location of the leak within 0.5 meters (3 feet). The Sahara tool simultaneously provides real-time visual inspection of live pipeline conditions thanks to an inline video system that travels along the pipe with the acoustic sensor.

Carried out regularly, comprehensive leak detection programs can not only identify large, potentially catastrophic leaks, but also smaller leaks that over time contribute to NRW and eventually become damaging themselves.

Abstract

Comprehensive condition assessment of wastewater force mains provides significant challenges to owners/operators of collection systems as the ability to shut down or expose the pipeline for a thorough inspection is often impractical due to operational and/or financial considerations. Traditional gravity sewer inspection techniques (i.e. visual-based technologies) do not always transfer easily to their wastewater pressure pipe counterparts and visual assessments do not provide the structural condition of force mains – something that is critical in determining the true pipe condition. Therefore, a different set of inspection tools and assessment techniques is required for force mains.

The most effective strategy to safely manage a force main inventory is to implement a risk-based approach for any data collection, inspection, condition assessment, and management techniques. Using asset risk to guide the management strategies, an owner/operator can ensure they are implementing the right approach, at the right time, with the lowest financial impact. While recent advances in force main inspection technologies, assessment techniques, and repair/rehabilitation methods now allow for substantial extension of existing asset service life, a risk-based approach to their implementation will ensure resources are focused on the correct pipelines. The goal should always be to focus the proper resources in managing the asset while safely getting the most service life out of the force main.

Authors

  • Travis B. Wagner, Pure Technologies Ltd., Columbia, MD, USA
  • Jennifer Steffens, Pure Technologies Ltd., Atlanta, GA, USA

Abstract

Bar-wrapped pipe (“BWP”) is commonly used in pressure pipelines due to its reliability, cost effectiveness and durability. Failure of BWP can occur as a result of long term leakage and subsequent corrosion or as a result of leakage and deterioration of the reinforcing bars over time. The failure can also be the direct result of a transient pressure or other sudden catastrophic events.

The consequence of failure may result in a significant disruption of operation and service for a water utility without any warning. This is a concern because assessing the condition of a damaged BWP is very challenging. In this paper, a nonlinear finite element analysis was used to evaluate the performance of a damaged BWP.

For the structural evaluation, stresses and strains developed in the damaged BWP were evaluated. Cracking and spalling of the mortar lining will eventually lead to the corrosion of the steel components. In an effort to account for the steel deterioration, the model was adjusted by reducing the thickness of the steel cylinder. This study investigates the behavior of a deteriorating BWP under various levels of distress and various internal pressures. The results based on a 24-inch pipe transmission main, are used to define criteria to evaluate the performance of a damaged BWP. Based upon the finite element results obtained in this study, suggestions for future work are presented and discussed.

Authors

  • Ali Alavinasab, Pure Technologies, Branchburg, NJ, USA.
  • Muthu Chandrasekaran, Pure Technologies, Columbia, MD, USA.
  • Edward Padewski III, Pure Technologies, Branchburg, NJ, USA.

For water service providers in Texas, providing customers with consistent, reliable access to water is crucial, particularly in the summer months when dry conditions impact the water supply.

In order to ensure that residents receive consistent water supply, the City of Irving and a partnering agency have collaborated in times of need to supply the other with water.

In one specific instance, the City of Irving was able to keep customers of the partnering agency supplied with water from one of its 48-inch transmission mains. The combined effort between the utilities showed excellent organizational cooperation to achieve the most important goal for any utility – finding a way to provide consistent service.

In January 2014, the two agencies teamed up again, this time to assess the critical 48-inch Jamison Main that links the two utilities. The transmission main was constructed in 1955 and is made up primarily of Bar-Wrapped Concrete Cylinder Pipe (BWP). Since its construction, however, the main has had modifications: in 1965 and 1968 sections of Prestressed Concrete Cylinder Pipe (PCCP) were added to accommodate the construction of Texas Stadium, and in 2009, another section of PCCP was added during the reconstruction of Loop 12 Highway.

The Difference Between PCCP and BWP

While BWP and PCCP look similar in cross-section, the pipe materials deteriorate in different ways and therefore are assessed differently.

For BWP, it is important for operators to identify and locate corrosion on the steel cylinder, since it is the main structural component and the bars are made with mild steel and are wrapped under less tension than PCCP; BWP essentially behaves like a mortar-lined and coated steel pipe.

PCCP is a concrete pipe that remains under compression because of the prestressing wires, with the thin-gauge steel cylinder acting as a water barrier. The high strength steel wire in PCCP is smaller in diameter and wrapped under higher tension, therefore corrosion makes it quite vulnerable to breakage.

Electromagnetic inspection tool

Electromagnetic inspection tool

Robotic tool insertion

Pure Technologies staff insert the robotic tool for assessment

As the prestressing wires in PCCP begin to break, the pipe becomes weaker and is more likely to fail catastrophically. It is important to locate and quantify the amount of broken wires in PCCP as they are the main structural component.

Because of the differences, the two materials are assessed using electromagnetic (EM) technology that identifies different signs of deterioration in each pipe.

In BWP, inspections identify both the presence of broken bars – which could indicate corrosion on the cylinder – and broad areas of corrosion on the cylinder itself. This approach allows operators to renew pipe sections with an undesirable amount of corrosion that could lead to pipe failure.

In PCCP, EM technology locates and quantifies the amount of broken wires. This method is extremely effective in identifying pipe sections that are suitable for renewal once the number of wire breaks passes a certain limit.

The Condition Assessment Program

For the Jamison Water Transmission Main assessment, the SmartBall® leak detection and PureRobotics® platforms were used to identify deterioration on both the primary pipe material, BWP, and the added sections of PCCP.

Completing a leak detection survey is an important aspect of a condition assessment project, since leaks are often a preliminary indication of a potential failure location. Pre-screening is particularly important in in BWP, since the steel cylinder is the main structural component and the pipe behaves similarly to a mortar-lined and coated steel pipe.

The leak detection survey identified one acoustic anomaly associated with a leak in 2.7 miles of inspection. The screening of the pipeline helps determine the baseline condition of the asset.

The PureRobotics platform was used for the structural assessment portion of the project. The tool is equipped with PureEM™ technology, which can identify distress on both pipe BWP and PCCP, but also features CCTV and above-ground tracking. By completing a structural assessment, damaged areas of the pipe can be targeted for selective renewal.

The Condition Assessment Program

In addition to gaining a valuable baseline condition of the transmission main, the assessment provided both utilities with more information about the location of additions to the critical transmission main.

The CCTV and line-locating feature were used to identify the exact location of two unknown manholes, which in turn were used as additional tracking locations. With more tracking locations during inline inspection, areas of distress can be more accurately located. The CCTV inspection also identified the location of a 48-inch gate valve and 90-degree bends.

Another challenge surrounding this main was accurate mapping of the sections that were added on after the original construction. Additions or alterations to existing pipelines can sometimes lead to inaccurate drawings. By tracking the tethered robotics tool above the ground using a manned sensor, Irving and its partnering agency were able to map out the relocated portions of the pipeline. This provides valuable information for future maintenance, assessment and renewal programs.

Through close collaboration, these two service providers were able to effectively manage a shared asset with the goal of preventing disruptive and expensive pipe failures. The information gained from the structural assessment will allow for the implementation of a cost-effective long-term pipeline management plan and effectively defer the replacement of the pipeline for the foreseeable future.

 

Learn More

Assess & Address Pipeline Management Program

Assess & Address Pipeline Management Program

Pure Technologies is helping utilities manage their buried infrastructure through its Assess & Address which can often be implemented for only a fraction of the capital replacement cost.

Case Study

Case Study: Trinity River Authority of Texas

After completing leak detection and structural condition assessment on 8.5 miles of PCCP and Bar-Wrapped Pipe, Trinity River Authority verified the results of inspection, finding three distressed pipe sections.

Technical Paper

Failure Risk of Bar-Wrapped Pipe with Broken Bars and Corroded Cylinder

This study investigates the behavior of a deteriorating BWP under various levels of distress and various internal pressures. The results based on a 24-inch pipe transmission main, are used to define criteria to evaluate the performance of a damaged BWP. Based upon the finite element results obtained in this study, suggestions for future work are presented and discussed.

Inspection methods for BWP and steel pipe that locate cylinder corrosion have only recently been developed and commercialized. Specifically for BWP inspection, tools that can identify both bar breaks – which are an indication of corrosion – and corrosion on the steel cylinder are the best for completing a thorough condition assessment.

The City of Calgary provides water and wastewater services for over 1 million people in the Greater Calgary area; many of its large-diameter transmission and sewer force mains are made of PCCP and BWP.

In an annual proactive condition assessment program, the City of Calgary inspects its PCCP and BWP for signs of deterioration using electromagnetic (EM) technology.

In May 2013, the City inspected 1.6 miles (2.2 km) of the 30-inch (750-mm) BWP Memorial Feedermain using PureRobotics™, which is a powerful robotic system equipped with PureEM™ technology that can be configured to inspect a variety of pipelines and materials with different operational conditions. In BWP, it is capable of locating both bar breaks and cylinder corrosion.

In August 2013, the City verified the results with Pure Technologies by excavating a pipe section that was identified as distressed during data analysis.

The results from the inspection identified only 3 of 232 BWP pipe sections with evidence of bar breaks, as well as 3 additional pipe sections with evidence of cylinder anomalies.

Pure Technologies’ data from over 8,000 miles of pressure pipe condition assessment indicates that only a small percentage of pipes (less than 5 percent) are in need of repair and therefore have a significant remaining useful life. Condition assessment data also suggests that pipe distress is localized and a significant ROI can be achieved by locating and addressing isolated problems through structural inspection.

In August 2013, the most distressed pipe section was excavated for verification. The results had predicted bar breaks and cylinder corrosion, which can eventually lead to pipe failure if not repaired or replaced. The validation confirmed the broken bars and a large area of cylinder corrosion.

Staff verify the pipe condition

Pure Technologies staff verify the pipe condition

Pipe verification

Verification of one pipe revealed bar breaks and corrosion.

The City of Calgary was pleased with the results, and through condition assessment, has been able to identify and address individual distressed pipe sections on an otherwise serviceable transmission main. This has allowed the City to avoid a potential rupture of the main in a high consequence area while increasing service reliability and the useful life of the Memorial Feedermain.

The other sections identified in the inspection have been prioritized and will be verified in a future repair cycle.

Learn More

Case Study

Case Study: City of Calgary Memorial Feedermain

In August 2013, the City of Calgary and Pure Technologies verified bar breaks and cylinder corrosion on a 30-inch Bar-Wrapped Pipe section on the Memorial Feedermain. The distressed pipe was identified in an annual inspection completed in May 2013.

Pipeline Inspection and Condition Assessment Services

Pipeline Inspection and Condition Assessment Services

We provide water and wastewater organizations a comprehensive suite of technologies that provide actionable pipeline information to better understand the condition of their pipe.

Technical Paper

Failure Risk of Bar-Wrapped Pipe with Broken Bars and Corroded Cylinder

This study investigates the behavior of a deteriorating BWP under various levels of distress and various internal pressures. The results based on a 24-inch pipe transmission main, are used to define criteria to evaluate the performance of a damaged BWP. Based upon the finite element results obtained in this study, suggestions for future work are presented and discussed.

hese distinctions can make assessing BWP challenging for pipeline operators attempting to renew their large-diameter water transmission mains, since the methods for determining baseline condition in the similar-looking pipe types are different.

PCCP is a concrete pipe that remains under compression because of the prestressing wires, with the thin-gauge steel cylinder acting as a water membrane. With BWP, the cylinder plays a much larger role in the structural integrity of the pipe. BWP is essentially designed as a steel pipe with mild steel used to manufacture the steel cylinder and steel bars.

The high strength steel wire in PCCP is smaller in diameter and wrapped under higher tension, therefore corrosion makes it quite vulnerable to breakage. The mild steel bars in BWP are thicker in diameter and wrapped under less tension, therefore corrosion takes significantly longer to lead to breakage.

This was the case for Trinity River Authority of Texas (TRA), who owns and operates 8.5 miles of 30-inch BWP and PCCP that supplies raw water from Lake Arlington to the Tarrant County Water Supply Project Water Treatment Plant in Euless, Texas.

The 30-inch pipeline, in conjunction with a parallel 54-inch pipeline, conveys raw water to TRA’s 87 mgd Water Treatment Plant (WTP). Treated water produced at the WTP is then supplied to five cities in the mid-cities region between Dallas and Fort Worth including Bedford, Colleyville, Euless, Grapevine and North Richland Hills.

TRA had originally planned to replace this pipeline, but chose to assess and selectively rehabilitate the pipeline by finding solutions that could identify the most distressed areas. The pipeline, constructed in 1973, is made up primarily of BWP, although there are some sections of PCCP.

In November 2012, TRA began a condition assessment program with Pure Technologies that included transient pressure monitoring, acoustic leak and gas pocket detection, internal electromagnetic inspection, and structural condition assessment including finite element analysis.

Pure Technologies staff verify the pipe condition

Pure Technologies staff verify the pipe condition

Crew verify and reveal corrosion on three pipe sections

Verification revealed corrosion on three pipe sections

After completing the inspections, TRA has verified and repaired three sections of BWP that were beyond the yield limit determined by BWP structural performance curves. During the verification, TRA and Pure determined that the distress areas identified in the structural assessment were accurate and the excavated pipe sections had bar breaks and corrosion.

The condition assessment project also identified four leaks and three gas pockets and although the four identified leaks were small (less than 2 gallons per minute), one was located in the front yard of a brand new church building and could have caused significant water damage had it not been repaired immediately by TRA. Water from this leak was visible at the surface 325 feet away from the actual leak location.

Through the use of condition assessment, TRA was able to selectively rehabilitate its assets for roughly 4 percent of the estimated $25 million replacement cost. The project has also allowed TRA to increase service reliability for customers in the region.

Learn More

Assess & Address Pipeline Management Program

Assess & Address Pipeline Management Program

Pure Technologies is helping utilities manage their buried infrastructure through its Assess & Address which can often be implemented for only a fraction of the capital replacement cost.

Case Study

Case Study: Trinity River Authority of Texas

After completing leak detection and structural condition assessment on 8.5 miles of PCCP and Bar-Wrapped Pipe, Trinity River Authority verified the results of inspection, finding three distressed pipe sections.

Technical Paper

Failure Risk of Bar-Wrapped Pipe with Broken Bars and Corroded Cylinder

This study investigates the behavior of a deteriorating BWP under various levels of distress and various internal pressures. The results based on a 24-inch pipe transmission main, are used to define criteria to evaluate the performance of a damaged BWP. Based upon the finite element results obtained in this study, suggestions for future work are presented and discussed.

The inspections are part of AWU’s proactive condition assessment program that focuses on leak detection and structural condition assessment through the use of advanced non-destructive technologies.

Focusing leak detection efforts on large-diameter pipelines is an excellent method to reduce Non-Revenue Water (NRW) and gather baseline condition information. While leaks on small-diameter distribution mains are the most common, leaks on large-diameter transmission mains account for a significantly higher percentage of the total water lost; repairing even one leak on a transmission main can achieve a significant reduction in NRW.

Identifying air pockets reduces pressure on pumps that are attempting to pump water past an air pocket. As pockets grow in size, they can adversely affect the flow and capacity of a pipeline.

In addition a reducing water loss, early identification of leaks helps reduce pipeline ruptures, as leaks are often a preliminary sign that a pipeline may eventually fail due to pipeline corrosion or loss of bedding support due to soil erosion. By identifying leaks early on, AWU is effectively reducing NRW, reducing their risk of failure, and gathering valuable baseline condition information on its pipelines.

SmartBall Tracking
SmartBall Tool

The inspections completed in June 2013 were completed on two separate pipelines, the Ulrich 72-inch Prestressed Concrete Cylinder Pipe (PCCP) potable water transmission main and the Airport Road 24-inch C-303 Bar Wrapped Pipe (BWP) and Cast Iron potable water transmission main.

AWU used SmartBall® technology for both inspections. The SmartBall tool is a free-swimming inline leak detection platform that identifies the acoustic anomalies associated with leaks and air pockets that operates while the pipeline remains in service. The tool is tracked via fixed or portable receivers that are positioned strategically throughout the planned inspection distance. Following an inspection, the collected data is analyzed to determine if the acoustic anomalies represent leaks or air pockets and verified by AWU staff.

The Ulrich inspection covered a total of 6.6 miles in 6 hours and located no leaks or gas pockets. In order to successfully complete the inspection, AWU staff had to overcome one major operational constraint to ensure the tool could complete the inspection distance. Shortly after the insertion near the Ulrich WTP, the pipeline travelled beneath the Colorado River before making a 200-foot vertical climb, which can be difficult for free-flowing technologies without proper preparation. To overcome the challenge, AWU and Pure Technologies completed comprehensive flow simulations during the project planning phase to ensure the tool could traverse the vertical incline; this allowed the SmartBall tool to successfully travel up the steep hill.

In the Airport Road inspection, 2.4 miles of inspection was completed, successfully locating three leaks and giving AWU confidence that there are no air pockets restricting flow capacity in this line.

During both inspections, AWU and Pure Technologies worked closely to overcome operational challenges that allowed for successful leak detection surveys.

AWU supplies water to nearly 890,000 customers within and outside the corporate city limits of Austin, as well as the communities of Rollingwood, Sunset Valley, one water control and improvement district, five water supply corporations, seven municipal utility districts, and three private utilities. To ensure reliable service to its customers, AWU proactively addresses its infrastructure needs through regular inspection and rehabilitation to prevent service disruption and costly emergency repairs.

 

Learn More

Pipeline leak detection systems

Pipeline Leak Detection Systems

Highly accurate inline leak detection systems that can detect leaks and gas pockets in operational pipelines. These systems are used primarily on larger diameter water and wastewater transmission mains of all materials as well as oil & gas pipelines.

Smartball- Leak and Gas Pocket Detention

SmartBall® – Leak Detection for Water Trunk Mains

SmartBall® is an innovative free-swimming in-line leak detection technology designed to operate in a live water mains.

Introduction

Underground pipelines are among the most valuable, yet neglected, assets in the public arena. They provide essential services such as supply of energy and drinking water and collection of wastewater. But we install the cheapest we can, bury it and forget about it – at least until something goes wrong. Then we are faced with having to fix the problem under emergency conditions, often considering only immediate needs and not the future operation of the pipeline in question.

This infrastructure must be seen as an asset, and managed as such. Properly maintained the pipe networks are valuable assets that are critical to delivering services to customers, and in any business the means of connecting product or service to customers is a major link in the business value chain. Not to maintain this network is negligent bordering on criminal.

Pipeline operators from around the world are discovering that simply replacing their aging pipeline assets is cost prohibitive and that advanced condition assessment services from Pure can help them confidently make informed decisions that drastically reduce capital and operating costs.

There are many ways in which a pipeline can deteriorate to a state of failure; countless sources of stress both inside and outside the pipe can take their toll.

Single-step blowouts of pipe walls are quite rare; pinhole leaks, hairline cracks, corrosion and leaking gaskets tend to occur first. Most catastrophic failures are caused by a sudden unexpected stress such as a water hammer acting on an existing weak point in the pipe. There is a widely held belief that the failure process is a simple one, where a pipe corrodes to the point at which it can no longer withstand the applied internal and external forces, resulting in a main break. However, research has shown that the failure process is more complex than expected. Corrosion plays a significant role in water main failures, but soil-pipe interactions, manufacturing techniques and human error are also important factors. Failures also take place in multiple stages rather than in a single episode. Early damage not only weakens portions of the pipe, it also allows water to escape, causing corrosion and washing out of the supporting soil.

Pipes at highest risk are typically constructed using dated materials or methods, running through an area with heavily vehicle traffic. Urban centers typically represent significant loss potential from damage caused by water main breaks as a result of high density buildings, underground infrastructure, important traffic thoroughfares, and economic loss potential of power, gas, water utilities and legal cases.

Older pipes that face stresses such as heavy traffic, construction activity, pressure transients or advanced age are more likely to fail. However there are other factors at work such as installation or material defects that may surface over a shorter period of time. The net result is that age alone can not be relied on as an indicator of a high risk pipe.

Types of pipe material and typical causes of failure:

Prestressed Concrete Cylinder Pipe (PCCP) has a unique failure mechanism: high strength steel pre-stressing wires that provide strength to the pipe can become distressed and reduce the structural integrity of the pipe. Broken wires can be caused by physical damage to the pipe, corrosion, or hydrogen embrittlement. Regions of broken wires may be accompanied by leaks, especially in pipelines smaller than 48 inches in diameter, where the internal steel cylinder corrodes at the same rate as the wires or where water escaping through the joint encourages corrosion. Leakage has been proven to be a key indicator of structural condition in lined cylinder pipe, a type of PCCP in which the prestressing wires are placed directly on the steel cylinder. These types of leaks can create voids around the pipe and introduce added stress at an existing weak point.

Corroded Wires, Embrittled Wires, Cylinder Perforation

Cast iron pipes corrode, become brittle and are prone to cracking. Many older North American cities have cast iron pipes that were installed in the 1800s, prior to the existence of pipeline standards, when methods of construction were not uniform and advanced quality control programs did not exist. Consequently, many pipelines were installed using what are considered poor construction practices by today’s standards.

Tuberculation, Bell Cracking, Longitudinal Cracking, Corrosion

Ductile iron pipes have failure mechanisms similar to those of cast iron pipes; however they become less brittle and consequently degrade at a slower rate. These pipes may be capable of supporting large leaks for longer periods of time without failing immediately.

Plastic and polyvinyl chloride (PVC) pipes are less prone to corrosion and less brittle than iron pipes. Failures in these pipes are often traced to leaking joints where the escaping water creates voids around the pipeline, causing unplanned stresses on the pipe.

Leadite is a sulphur-based joint-sealing compound commonly used in the 1940s and 1950s that appears to produce pipe failures due to the difference between its coefficient of thermal expansion and that of the metal in the pipes it seals. Leadite in pipe joints expands at a different rate than the pipe itself, causing added stress near the joints. This undesirable behaviour has resulted in particularly destructive joint ruptures on otherwise strong iron pipes.

Steel pipes primarily fail due to loss of integrity at welds, and external corrosion causing severe pitting and weakening the pipe wall. Both losses of joint integrity and through-wall corrosion pits lead to leakage long before failure. Older steel pipes in aggressive environments are capable of sustaining massive levels of leakage for decades before failing.

Introduction

A significant percentage of the United States force mains have been in use for several decades and never been assessed or proactively managed. To safely rely on these pipelines, their condition should be periodically checked to ensure there are no locations susceptible to failure.

In addition, many wastewater agencies are faced with EPA consent decrees that require condition assessment of force mains. As a result, many agencies are now faced with the daunting task of assessing their sewer force mains—a task that until recently was often not feasible due to operational constraints. However, Pure Technologies continues to improve technology and can now obtain a realistic assessment of a force main within the common constraints of most wastewater agencies.

Authors

  • Michael S. Higgins, P.E.; Pure Technologies, Columbia, MD, USA.